Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble MillsBy John A. Herbst, Alexander Potapov, Xiangjun Qiu
"High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB
Jan 1, 2003
-
The Central Mukur Gold ProjectBy Elmer Stewart, Richard May
"The Central Mukur deposit was discovered by the Semipalatinsk Geological Exploration Expedition (GEE) during detailed searches from 1977 to 1980. Andas Altyn Ltd., a Kazakhstanian gold mining company
Jan 1, 1999
-
The Role of Applied Biotechnology in Decommissioning Mining OperationsBy Margarete Kalin
"Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma
Jan 1, 1998
-
In-track assessment of premium and intermediate grade rail steelsBy K. J. Griffin, G. W. Rosval
"In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi
Jan 1, 1988
-
Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical ProcessesBy M. Arvola, A. Mäkinen, N. Isomäki
Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.
Jan 1, 2016
-
Concepts for Remote Mineral ProjectsBy L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacityBy George Hope, Brigitte Lacouture
"The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted
Jan 1, 2003
-
Convergence of Safety Technologies ISARC ? World Mining Congress 2013Pressure for Better Safety Practices ? Increase Government Regulation ? Safety practices evolve from: ? Increased efficiency and performance ? More knowledgeable workforce ? Focus on decreasing
Aug 1, 2013
-
Analysis and Optimisation of life-of-Mine Haulage Cost using SimulationBy Niklas Frank
Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau
May 1, 2003
-
Gyratory Crusher Wear Monitoring Using Laser TechnologyBy Persio P. Rosario
Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the
May 1, 2002
-
Development of value-added zeolite products from St. Cloud MiningBy R. S. Bowman, G. S. Austin, J. M. Barker, P. S. Freeman
The physical, chemical and mineralogic characteristics of zeolites allow commercially important applications. While adoption of zeolite technology is slow in the United States compared to other region
Jan 1, 2004
-
Equity Silver Mines Scavenger CircuitBy P. G. Semple
"In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t
Jan 1, 1987
-
Environmental Control Design at Shebandowan MinesBy T. Peters, W. C. Ferguson
"Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No
Jan 1, 1975
-
Magnetic Gold: Losses from a Gold Recovery CircuitBy Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher
A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl
Jan 1, 2014
-
Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper OreBy F. M. Makarinsky
"SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced
Jan 1, 1975
-
Formulation and Plant Trial of a Mixed Collector Suite For Eland PlatinumBy Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula
"The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.
Jan 1, 2011
-
Advanced Control for Column FlotationBy G. A. Kosick, G. S. Dobby
"This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense
Jan 1, 1990
-
The Greenhills surface coal mining projectBy Clifford Britch
"Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine
Jan 1, 1981
-
Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and DesignBy Fidelis T. Suorineni
Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories
May 1, 2011
-
Prestress and Stress Around A Redistribution 1n Mine OpeningBy C. L. Emery, A. V. Corlett
"The stress equilibrium is disturbed in a body of rock by a mine opening and is restored by a redistribution of the stresses around the opening. The pattern of the redistribution of unilateral stress
Jan 1, 1959