Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Malartic Gold District, Abitibi Greenstone Belt, Quebec: geological setting, structure and timing of gold emplacement at Malartic Gold Fields, Barnat, East-Malartic, Canadian Malartic and Sladen Mines

    By Claude Hubert, Robert Sansfaçon

    "The Malartic gold camp includes the Malartic Gold Fields, Barnat, East-Malartic, Canadian Malartic and Sladen mines. From 1935 to 1984, these mines have yielded 212 403 kg of gold. They occur within

    Jan 1, 1990

  • CIM
    Joining of Steel and Aluminum by Means of Friction Stir Welding Process

    By Sazol Das, Hany Ahmed, Ganesh Bhaskaran, Zhuoru Wu

    "Friction stir welding (FSW) process in lap configuration for dissimilar materials has been developed and tested for steel to aluminum joining. A novel cylindrical tool was designed for improved mater

    Jan 1, 2018

  • CIM
    Modifying the Design of Drying Chamber Flights of the Gol-E-Gohar Pelletizing Plant Ball Mill

    By S. Banisi, A. R. Hasankhoei, Gh. Parsapour, A. R. Ghasemi

    At the Gol-E-Gohar mining and industrial Company, a pelletizing plant, which includes two parallel dry closed grinding circuits and a pellet production circuit, produces 600 t/h. Each grinding circuit

    Jan 1, 2016

  • CIM
    Adequacy of World Mineral Supply

    By Leonard L. Fischman

    It is important to define "adequacy," and the most useful definition is a continuing availability of mineral materials under cost and other conditions which imply no significant burden on the achievem

    Jan 1, 1977

  • CIM
    Development of Gypsum Deposits 1n Southern Newfoundland

    By D. M. Baird

    "Enormous deposits of gypsum of exceptionally high grade are readily accessible in southwestern Newfoundland. Coming large-scale production from one of these is resulting in renewed interest in deposi

    Jan 1, 1959

  • CIM
    Implications of Trends in Base Metals and Gold Financing, and Acquisitions Activity

    By Michael Chender

    Emerging Equity Sources ? Larger IPOs ? China Inc. ? Other sovereign wealth funds ? New funds and higher allocations ? Private equity

    May 1, 2010

  • CIM
    Diamond-bearing Kimberlites in Saskatchewan, Canada: The Fort à la Corne Case History

    By Rodney G. Orr, Phil Robertshaw, Roland Loewer, Klau Lehnert-Thiel

    This paper documents the 1988 discovery and subsequent evaluation (to 1991) of diamond bearing kimberlites in the Fort à la Corne area, Saskatchewan, by Uranerz Exploration and Mining Limited. Cameco

    Jan 1, 1992

  • CIM
    Three Dimensional Numerical Modelling of Joint Spacing and Orientation Effects on Rock Cutting Process by a Single TBM Cutter

    By A. A. Iranzadeh

    The performance of a tunnel boring machine (TBM) depends on the efficiency of the cutters, which can be influenced by geological conditions and rock mass properties. In this study, a three-dimensional

    Jan 1, 2009

  • CIM
    Metallurgical Test Program For Fission Uranium Corp.’s Triple R Uranium Deposit

    By Lawrence Melis

    Fission Uranium Corp.’s Triple R Uranium Deposit at its Patterson Lake South Project is located in northwest Saskatchewan in Canada’s Athabasca Basin. As part of pre-feasibility studies for the projec

    Jan 1, 2020

  • CIM
    Development of 'Post' Pillar Mining At Falconbridge Nickel Mines Limited

    By Roy S. Celland, K. H. Singh

    The introduction of 'post' pillar mining at the Strathcona mine represents a new approach to ground support in cut-and-fill applications. The method has also shown significant economic advantages. It

    Jan 1, 1973

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Challenges of Mines Rescue in Expanding Mine Operations

    By J. K. Armstrong, C. Feyerabend

    "As mines are constantly growing and expanding, so do the challenges for emergency response teams. They have to keep up with the pace set by current and future production techniques. Although mines ha

    Jan 1, 2019

  • CIM
    Development of a Process for the Production of Lightweight Aggregate and Pozzolan From Lakeview Generating Station Fly Ash

    By J. F. Boux

    "The study of the total utilization of fly ash has involved all of the known technology in the processing of this waste material into useful products. In addition, a complete knowledge of all the poss

    Jan 1, 1970

  • CIM
    Effects of Uniform Direct Chill Casting Process on Structure of 7055 Alloy Billet

    By C. S. Chen, Y. J. Luo, M. W. Gao, B. Li, Z. F. Zhang

    "To obtain large-sized billets with fine grains and homogeneous elements distribution, uniform direct chill (UDC) casting process, based on annular electromagnetic stirring coupling with intercooling,

    Jan 1, 2018

  • CIM
    ONSET OF A BOTTLENECK ? The Permitting and Regulation of New Mining Projects - The Western Canadian Experience

    What Bottleneck? ??Resurgence of BC Mining Industry; ??Climate of heightened activity ?Increases pressure placed upon regulatory agencies; ??Current EA and permitting system, when Federal agencies

    May 1, 2006

  • CIM
    Innovative Use of Advanced Technology in Mining

    By Craig Dirk

    Agenda Applications of ?GPS ?Drill Navigation ?Cycle time monitoring ?UDS / Boom Stress monitoring ?Payload systems ?Laser Surveying Future Applications

    May 1, 2006

  • CIM
    Shape Characterisation: Can Different Devices Produce Comparable Data for Particulate Samples?

    By Megan Becker, Aubrey Mainza, Indigo Research Laboratories, Jenny Wiese, Gaynor Yorath, Lucy Little

    Particle shape characterisation has an important role to play in mineral processing, to clarify effects of shape on rheology, equipment wear rates, comminution, classification, sizing and flotation. H

    Jan 1, 2016

  • CIM
    Shear Strength Assessment of a Footwall Slab Using Finite Element Modelling

    By Navid Bahrani

    Overview ? Case history of footwall slab failure ? Procedure used to build a finite element model ?? Pre- and post- mining topography ?? Slab geometry ?? Excavation stages ?? Input parameters ?

    May 1, 2008

  • CIM
    Improving Melt Cleanliness and Mechanical Properties of AZ91e Permanent Mould Castings with Melt Filtration

    By A. Elsayed

    Lightweight metals such as magnesium show potential in replacing aluminum alloy castings for engine cradles, cylinder heads and transmission cases. Unfortunately, magnesium alloys are susceptible to e

    Jan 1, 2011

  • CIM
    Considerations for Technology Introduction Under the Explosive Free Rock Breakage Explosive-Consortium

    By Bétournay. M. C.

    Advantages ?Safety ?Health ?Rapid, continuous development, productivity ?Stope dilution reduction Disadvantages ?High cost and long time for equipment development ?Hard rock mining condition l

    May 1, 2009