Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    ISO Management Standard for Energy Management - WIIFM (What's In It For Metallurgy?)

    By A. Taylor, E. Thorn Corthay, R. Storey

    In response to requests from its stakeholders, the International Standards Organisation is engaged in development of an international standard for Energy Management Systems (EnMS) which will become "I

    Jan 1, 2010

  • CIM
    Vision-Based Action Recognition in the Internal Construction Site using Interactions Between Worker Actions and Construction Objects

    By J. Y. Kim

    This paper presents a novel action recognition method for observing human workers using interactions between actions and related objects on an internal construction site. This method can be used to me

    Aug 1, 2013

  • CIM
    The Application of Geophysical Methods to Improve the Quality of Resource and Reserve Estimates

    By G. D. Mcdowell, L. B. Cochrane, B. D. Thompson

    "Abstract - Exploration for deep underground copper and nickel sulfide deposits in the Sudbury mining camp is carried out with surface drilling. More detailed drilling, with an advanced underground ex

    Jan 1, 1998

  • CIM
    Roasting and Smelting Practice at the Thompson Plant of The International Nickel Company of Canada, Limited

    By J B. McConnell

    The Thompson smelter has three unique features which form the basis ~f its design: fluid bed roasters which treat nickel concentrate filter cake from the mill, as well as the flux, in order to achieve

    Jan 1, 1963

  • CIM
    The Outotec Nickel Matte Chloride Leaching Process

    By J. -P. Lempainen, K. Haavanlammi, K. Valkama

    The Outotec nickel matte chloride leaching process is especially suitable for small capacity standalone nickel refineries. The matte is leached with hydrochloric acid and oxygen in multiple steps in a

    Jan 1, 2014

  • CIM
    Ventilation and Dust Control at the Wright-Hargreaves Mine

    By G. Reuben Yourt

    IN 1935, Wright-Hargreaves Mines, Limited, initiated an enlarged programme of ventilation. In the mine, surveys were made from time to time by the geological staff, and improvements in ventilation wer

    Jan 1, 1940

  • CIM
    Energy Recovery from High Temperature Steel, Copper and Nickel Smelter Slags

    By A. Warczok, C. M. Diaz, A. Bergman, T. Utigard, M. Barati

    The world wide consumption of energy is steadily increasing and by 2030 it is forecasted to grow by another 50%, leading to mounting political and economic pressures. For any pyrometallurgical operati

    Jan 1, 2011

  • CIM
    Arsenic Codeposition during the Initial Phases of Nucleation and Growth on Stainless Steel in Normal Copper Electrowinning Conditions

    By E. Fiset, T. Hennebel, F. Verbruggen, A. Prévoteau, K. Rabaey

    Arsenic (As), bismuth (Bi) and antimony (Sb) are known to affect the quality of copper deposits in copper electrowinning operations. The codeposition of As was previously believed to occur only at cur

    Jan 1, 2019

  • CIM
    Commuting To Work At The Mattabi Mine

    By J. C. White

    "During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i

    Jan 1, 1976

  • CIM
    Recent Developments in Rock burst Research at Lake Shore Mines

    By Ernest A. Hodgson

    A SERIOUS hazard which must be faced in some mines, though quite absent in others, is that of rockbursts. Bursts cannot be wholly avoided in such mines, but the hazard would largely disappear if they

    Jan 1, 1943

  • CIM
    Automatic Control of Grinding Circuit at East Malartic Part 1

    By A. Gillis, J. Keyes

    "This is a prelirr1inary report on automatic control at East Malartic Gold Mines.After installation of the cyclones in the East Malartic grinding circuit, the interest was aroused in the automatic con

    Jan 1, 1965

  • CIM
    Effect of Cu Additions upon the Strengthening Mechanisms and Recrystallization Behavior in Al-Mn-Fe-Si Heat Exchanger Fin Stock

    By Takanori Kokubo, Kenta Suzuki, Tomohiro Sasaki, Toshiya Anami

    "Previous work has shown that the strengthening Al-Mn alloys with copper leads to the formation of an undesirable reduction in recrystallized grain size. In this study the mechanisms of strengthening

    Jan 1, 2018

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia

    By C. H. Ash

    "Abstract-The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of western Canada. It

    Jan 1, 1997

  • CIM
    Development of Corrosion-Resistant Low Alloy Steels for Commercialization

    By B. Voyzelle

    The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr

    Jan 1, 2005

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    Borehole hoisting at Sherritt's Fox Mine

    By J. G. Kelly, C. P. Brown

    "In June 1983 a new borehole hoisting system was commissioned at Sherritt Gordon's Fox Mine. Twelve hundred tons-per-day of ore from the 2600 and 2800 levels are being hoisted to the 2000 level t

    Jan 1, 1985

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - Enrichments of Platinum-group Elements in Hydrogenous, Diagenetic and Hydrothermal Marine Manganese and Iron Deposits

    By Doris Stüben, Geoffrey P. Glasby, Akira Usui, Jörg-Detlef Eckhardt, Bruce W. Mountain, Zsolt Berner

    "Abstract - Twenty-seven marine Mn and Fe deposits chosen for their diverse origins have been analyzed for five platinum-group elements (PGE). The PGE display their highest concentrations in hydrogeno

    Jan 1, 1999

  • CIM
    Computational Fluid Dynamics Application for Thermal Management in Underground Mines

    By A. P. Sasmito

    It is well known that underground miners are exposed to one of the most dangerous working environments on earth. As mine delve deeper, the geological factor, mine position and climate condition as wel

    Aug 1, 2013

  • CIM
    Nuclear Fuel Resources and Price Trends

    By D. D. Bell

    This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr

    Jan 1, 1967

  • CIM
    Fly-In Program at Rabbit Lake

    By F. R. Nogas

    "Because of the elements of uncertainty and instabilitp associated with single-enterprise communities, there is increasing interest in the alternatives to developing additional new communities of this

    Jan 1, 1976