Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Raise Boring at The International Nickel Company of Canada,• Limited, Ontario Division

    By W. J. Taylor, T. D. Parris

    "Over 90,000 feet of raise have been bored at International Nickel underground mining operations throughout the Sudbury District since the advent of raise boring in the early part of July, 1964. With

    Jan 1, 1972

  • CIM
    The Coal Problem in Great Britain and the World

    By John T. Whetton

    "FROM 1850 when the annual production was around 50 million tons, coal output in Great Britain expanded rapidly to 225 million tons in 1900 and 287 million tons in 1913. However, during the First Worl

    Jan 1, 1960

  • CIM
    Balmer's in-pit coal conveyor: Improving haulage efficiency

    By C. H. van Eendenburg

    "Installation of a 3.6 km long raw coal conveyor in the Balmer open pit was undertaken to improve over-all haulage efficiency. This paper covers the rationale behind this project, system design and co

    Jan 1, 1990

  • CIM
    The Winning of Clays and Shales

    By J. F. McMahon

    Introduction The greater portion of the information presented in this paper was obtained in the course of an investigation on clay gathering and its cost in the provinces of Quebec and Ontario (1). F

    Jan 1, 1933

  • CIM
    Pilot Plant Pressure Oxidation of a Refractory Gold-Silver Concentrate

    By D. Yuan, L. Yan, M. J. Collins, P. Kalanchey, I. M. Masters

    ABSTRACT Pressure oxidation tests have been conducted by Sherritt for a refractory gold-silver project in China. The feed contained 39 g/t Au and 970 g/t Ag; the major gold-bearing minerals were pyrit

    Jan 1, 2013

  • CIM
    Sintering optimization of manganese ore fines: A mixed multilinear regression and linear programming model

    By M. F. Almeida

    "Due to the randomness of all factors influencing the sintering operation, a two-stepped procedure is proposed to find the best way of using stocked fines at a plant producing Fe-Mn alloys for the ste

    Jan 1, 1998

  • CIM
    Mechanical Behavoir of Beishan Granite with Calcite-Cemented Joint under Uniaxial Compression

    By J. F. Liu, L. Chen, C. P. Wang

    "Calcite-cemented joints abound in the rock masses of Beishan area, which is the most potential area for the high-level radioactive waste (HLW) disposal of China. The mechanical properties of Beishan

    Jan 1, 2015

  • CIM
    Earned depletion and the mining industry

    By Robert B. Parsons

    "Originally intended to be implemented in 1977, but actually introduced effective May 6, 1974, the earned depletion regulations have been substantially refined and modified since their appearance on t

    Jan 1, 1981

  • CIM
    Energy Consumption -Its Growth and Pattern

    By H. B. Merlin

    "The past demands for energy and the contributions by the major sources are shown for the world and regions, and for Canada. Three forecasts of future demand are presented. By the year 2000, the world

    Jan 1, 1969

  • CIM
    Ore Characterization and the Value of QemSCAN

    The use of QemSCAN in providing mineralogical input to detailed ore and product characterization has proved of immense value in recent years. In this paper, a brief review of selected Cu-case studies

    Jan 1, 2007

  • CIM
    Increase of Productivity in a Magnesite Flotation Operation by Means of Selective Milling

    By A. P. Yovanovic, P. Bonadia, M. N. Moraes, C. F. Matos

    "The magnesite flotation operation of Magnesita Refractories, in Brumado – Brazil, has four parallel ball mills working in closed circuit with hydrocyclones to grind the ore for the reverse flotation

    Jan 1, 2016

  • CIM
    Three Mining Methods for Vertical, Inclined and Thick Coal Seams Used in France

    By G. Ellie, D. F. Coates

    "The mining of coal in thick and inclined seams is difficult, and there are only a few countries in the world that are really interested in the problems associated with their exploitation. In France a

    Jan 1, 1972

  • CIM
    Noranda/Teniente Copper Bath Smelting Process Variations Impact on Energy Requirements

    By C. M. Díaz, P. J. Mackey, P. Coursol

    In a recent paper [1], the present authors discussed calculated energy consumption numbers in copper sulphide concentrate smelting for four different smelting technologies. For the present study, from

    Jan 1, 2011

  • CIM
    Deep Shaft Sinking Mechanisation Developments

    By F. A. Auld

    "Traditionally deep shaft sinking from the ground surface was carried out using drill and blast methods. Although large diameter blind shaft drilling has been carried out successfully on numerous occa

    Jan 1, 2019

  • CIM
    Thermodynamic Modeling of the Mn-RE Systems for the Application of RE in Mg Alloy Development

    By I-H. Jung, J. Kim

    "Mg alloys are extensively used as light structural materials in modern industry. Mn and RE (rareearth) metals are effectively used as alloying elements to enhance the properties of Mg alloys. Therefo

    Jan 1, 2012

  • CIM
    The Mechanism of Fatigue: A Review

    By R. C. A. Thurston

    AT A FATIGUE SESSION organised by the A.S.T.M. in 1949, R. E. Peterson presented a brief introductory paper ( 1) in which lie referred to a discussion on the fatigue of metals which took place in Engl

    Jan 1, 1957

  • CIM
    Development of Ontario's cap lamp standard

    By John Vergunst

    "This paper traces the development of Ontario 's cap lamp standard. Over the years, numerous Coroner's Juries investigating fatal mine accidents have made recommendations with respect to und

    Jan 1, 1989

  • CIM
    The Base of the Cambrian System in the Southeastern Cordillera of Canada

    By R. A. Price

    The base of the biozone of Olenellus is accepted as the most universally applicable criterion for defining the base of the Cambrian System. The use of this definitive criterion is restricted by import

    Jan 1, 1956

  • CIM
    Recovery of Zinc, Manganese and Lead from Pyrometallurgical Sludge by Hydrometallurgical Processing

    By J. -F. Blais, M. -O. Simonnot, P. Charbonnier, J. Mocellin, Université de Lorraine INRA, G. Mercier

    "Huge amounts of air pollution scrubber sludge have been generated during ferromanganese production using blast furnace. These residues have been historically deposited in ponds near steel making plan

    Jan 1, 2016

  • CIM
    Metallurgical Dust Collection in the Open Hearth and the Sinter Plant

    By A. C. Elliott, A. J. Lafreniere

    THE Hamilton Works of The Steel Company of Canada is a fully integrated steel plant with an annual capacity of three million tons. Located on the south shore of -Hamilton bay, it is in the centre of H

    Jan 1, 1962