Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Bulk Processing Materials by of Fine Compound Water Cyclones

    By J. Visman

    "The Compound Water Cyclone is a concentrator for the wet processing, in bulk, of finely divided materials such as slack coal, fine ores and mineral sands. It was originally developed by the Fuels and

    Jan 1, 1966

  • CIM
    Recent Changes in Milling Practice at Britannia

    By W. G. Hatch

    Introduction In November, 1927, a paper was presented at the Annual Meeting of the British Columbia Division by H. A. Pearse(l), in which he described the milling practice at Britannia and set forth

    Jan 1, 1932

  • CIM
    Iron (III) Removal from Chloride Solutions by Solvent Extraction

    By A. P. Paiva

    The solvent extraction properties exhibited by some /V,N'-tetrasubstituted malonamides to efficiently and selectively recover iron(III) from concentrated chloride leaching solutions can be found

    Jan 1, 2006

  • CIM
    Biomass Carbide Injection into Blast Furnace

    By H. Tsuruta, A. Fujibayashi, I. Sumi, A. Murao, R. Murai

    Injection of biomass into blast furnace as alternative reducing agent is so effective for the purpose of mitigation of carbon dioxide emissions from steel industries, because biomass is considered to

    Jan 1, 2015

  • CIM
    Maritimes coal fields - geological setting

    By A. Roy MacLean

    "In the Maritimes, there are twelve coal areas. From east to west, these include the Sydney coal field, the St. Rose - Chimney Corner, Inverness, Mabou, Port Hood, Pictou, Colchester - Debert, Springh

    Jan 1, 1985

  • CIM
    Resin-grouted cable supports for coal mine ground control

    By S. C. Tadolini, J. M. Goris, J. L. Gallagher

    Cable supports offer several advantages over traditional secondary support methods by enhancing stress redistribution to pillars and gob areas, minimizing or eliminating timbers and cribs that reduce

    Jan 1, 1999

  • CIM
    Design of the AGA Brasil Refractory Gold Pressure Oxidation Plant

    By I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins

    "AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí

    Jan 1, 2012

  • CIM
    Environmental applications of surface and airborne geophysics in mining

    By M. Pesowski

    "Certain environmental problems can substantially alter the physical properties of the subsurface. In such cases, geophysical methods can be used to map the distribution of subsurface contamination or

    Jan 1, 1993

  • CIM
    History of Developments in Mineral Processing in Canada from 1921 to Present Time

    By John Convey

    This paper, a follow-up to an earlier study, gives the history of Canadian developments in mineral processing from 1921 to the fall of 1964. It deals extensively with comminution and flotation, and th

    Jan 1, 1965

  • CIM
    Organic Centre-Lake Sediments-Application in the Geochemical Exploration for Gold in the Canadian Shield of Saskatchewan

    By William B. Coker, Vladimir J. Sopuck, J. S. Fox

    "Preliminary investigations indicate that organic lake sediments offer some potential for gold exploration within the Canadian Shield of northwestern Saskatchewan. It is also apparent that certain pre

    Jan 1, 1982

  • CIM
    Geology of the Izok Massive Sulfide Deposit, Nunavut Territory, Canada

    By Ian R. Morrison

    "Abstract - The Izok Zn-Cu-Pb-Ag volcanogenic massive sulfide deposit is located 265 km south of Kugluktuk (Coppermine), Nunavut Territory, Canada, in the west-central Slave structural province. The I

    Jan 1, 2004

  • CIM
    A Review of the Geological Characteristics of 'Gold-Only' Deposits in the Superior Province of the Canadian Shield

    By C. Jay Hodgson, P. J. MacGeehan

    "Of the 135 current or past-producing 'gold-only' mines in the Superior Province of the Canadian Shield which have produced more than 100,000 tons of ore, the 33 mines which have produced one million

    Jan 1, 1982

  • CIM
    Stirred Milling at Anglo American Platinum

    By Chris Rule

    This paper tells the story of the rapid commercial application of stirred milling technology at Anglo American Platinum?s many Concentrators. The first stirred mill ? a 10 000 litre IsaMillTM; the lar

    Jan 1, 2012

  • CIM
    Reducing Energy Consumption by Alternative Processing Routes to Produce Ferrochromium Alloys from Chromite Ore

    By Arthur Barnes, Mika Muinonen, M. J. Lavigne

    "The carbothermic reduction of chromite ore to produce high carbon ferrochromium is among the most energy intensive metal extraction processes performed, due not only to the highly endothermic nature

    Jan 1, 2015

  • CIM
    Carmen De Andacollo ? Start-Up of Teck?s New Copper Concentrator

    By C. S. R. Rondestvedt

    In February 2010, Teck?s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Clayburn-Harbison Limited Operations in British Columbia

    By R. H. Beaton

    "About 1905, a plant was constructed at C1ayburn, in the Lower Fraser valley, 4'5 miles east of Vancouver, to process shales from Sumas mountain into heavy clay products. In time, mining operations we

    Jan 1, 1959

  • CIM
    Isotopic and Fluid Inclusion Constraints on the Origin of Vein Au Mineralization at Bousquet Township, Quebec

    By Lawrence D. Hoy, Armand Savoie, Pierre Trudel, Ghislaln Tourigny, Robert Crépeau, Lao Kheang

    "Recent fluid inclusion and stable isotopic studies in the Bousquet mining district have identified spatial and temporal trends in mineralization temperatures and isotopic compositions of vein forming

    Jan 1, 1990

  • CIM
    Sinking of a Circular Air Shaft to No. 12 Colliery at New Waterford, N.S.

    By W. C. Risley

    IN the year 1933, workings at the No. 12 colliery, New Waterford, of the Dominion Coal Company, Limited, had advanced to a point where additional ventilation would soon be required. Furthermore, devel

    Jan 1, 1936

  • CIM
    Open-Pit Dewatering at Pine Point Mines

    By B. Calver, D. J. M. Farnsworth

    "As open-pit operations expanded at Pine Point, hydraulic aquifer evaluation was undertaken to establish the criteria necessary for the design of a feasible dewatering system.The extreme climate of th

    Jan 1, 1969

  • CIM
    Development Methods and Equipment at Lake Shore Mines, Limited

    By G. J. Birnie

    Introduction The preparation of the following paper has been undertaken in the belief that a description of the development methods and equipment used at Lake Shore, at the present time, will prove

    Jan 1, 1950