Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Benefits and Challenges of “Split Milling” at the Williams Mill

    By Glenn Norris, Tyler Buckingham

    "Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini

    Jan 1, 2010

  • CIM
    The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification

    By J. P. Mogan, E. D. Dainty, A. Lawson

    "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner

    Jan 1, 1981

  • CIM
    Greenhouse Gas Abatement Through Energy Optimization

    By David Clarry

    ?The issue ?reduction requirement ?Planning abatement steps ?Energy Management & Energy Efficiency ?Energy Recovery / Utilization ?Alternative Energy Professional Services Overview ?Capital Pro

    May 1, 2009

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • CIM
    Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history

    By A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham

    "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph

    Jan 1, 1987

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • CIM
    Treatment and History of Arsenic Bearing Ores at Con Mine

    By Adrian Daniel

    "Dating back to 1934, Con Mine is located directly south to the city of Yellowknife in the NWT, Canada. With mill operations ceasing in 2004, a challenging surface remediation situation resulted which

    Jan 1, 2009

  • CIM
    Exploration risk

    By R. G. Burn

    "A brief outline will be given of the concept of risk and its implications with regard to investment in exploration. The relationship between risk and decisions under uncertainty will be examined as a

    Jan 1, 1984

  • CIM
    Techno-economic evaluation of thiosalt treatment processes

    By K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy

    Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente

    Jan 1, 1988

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options (CIM Journal | Vol. 4, No. 4)

    By D. Van Tonder, C. Edwards

    ABSTRACT Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium-bearing solution prior to final product precipitation. A number of strip options are available

    Jan 1, 2013

  • CIM
    Phoenix Copper Leach - Cathode Eight Years in the Making

    By A. R. House, G. W. Shepherd

    Newmont USA Limited owns and operates the Phoenix Mine near Battle Mountain, Nevada, USA. The existing milling facility has operated since 2006 (House, 2010). Following the startup of the milling oper

    Jan 1, 2014

  • CIM
    Selecting the Correct Cyanide Destruction Process for Your Operation

    By R. Agius, A. Nacu

    "Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to

    Jan 1, 2017

  • CIM
    Development of Barrick Gold’s Bulyanhulu Mine

    By John Frostiak

    "Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,

    Jan 1, 2003

  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1

    By Marc Legault

    The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra

    May 1, 2004