    The Business Case: Defining the Project

    By Rob Boom, Yasuyuki Tozaki, Greg Traquair

    The objectives of the business case are to examine a proposed metallurgical project and answer fundamental questions about project feasibility, risks, opportunities, and value. A business case fulfill

    Jan 1, 2015

  • CIM
    Uranium in Early Proterozoic Aillik Group, Labrador

    By Sunil S. Gandhi

    "Uranium occurrences are widely distributed in tuffaceous-argillaceous beds and abundant rhyolitic volcanic rocks of the upper Aillik group, which is more than 3 km thick and over 125 km by 40 km in a

    Jan 1, 1986

  • CIM
    The Flsmidth® Rapid Oxidative Leach (Rol) Process. Part Ii: A New Chemical Activation Process for Chalcopyrite

    By F. Baczek, S. S. Rocks, D. Chaiko, C. Eyzaguirre, S. Asihene, T. Walters

    The majority of efforts to improve primary copper sulfide leaching have focused on solution chemistry, temperature, O2 pressure, ultra-fine grinding, the use of catalysts, etc. Historically, very few

    Jan 1, 2015

  • CIM
    Comparison of Mine Ventilation Software Tools for Underground Coal Mines in Harsh Conditions

    By T. Imgrund, A. Bischoff, S. Spürk

    "Specific conditions of underground coal mines at great depth, such as high temperatures, high rates of methane inflow and natural ventilation pressure provide considerable challenges for the reliable

    Jan 1, 2019

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    Redesign of Furnace No. 1 at the Pobuzhsky Ferronickel Combine

    By N. Novikov, M. Jastrzebski, N. Kryzhanovskaya, D. Shevchenko, I. Kapran, N. V. Novikov, T. Koehler, B. Zaporozhets

    "The PFK FeNi Smelter was re-commissioned by Solway Resources in 2002, ending a long period of economic decline in the adjacent town. In 2009 Hatch was retained to design, supply and install a custom

    Jan 1, 2012

  • CIM
    The Social Acceptability Process of the Canadian Malartic Mine

    By Philippe Angers

    This article analyzes the social acceptability process of a mining project located in an existing city. It will explore how the principles of sustainable development have been integrated in the projec

    Aug 1, 2013

  • CIM
    Projet De Modification De La Directive 019 Modifications Proposées

    By Francis Perron

    The Directive 019 on mineral industry, which was officially adopted in 1989, is the main tool used by the Quebec Ministry of Environment for the environmental evaluation and control of mineral exploit

    Nov 1, 2002

  • CIM
    APC at Laronde: The Progressive Control Approach

    By T. Banerjee, Y. Dumais, R. Lemire

    "Agnico Eagle LaRonde produces over 300,000 ounces of gold annually, along with silver, zinc and copper by-products. The LaRonde plant consists of a conventional SAG and Ball mill circuit, followed by

    Jan 1, 2018

  • CIM
    A Visual Sensing Approach to Estimate Material Hauling Cycles in Heavy Construction and Surface Mining Jobsites

    By E. Rezazadeh Azar

    Dump trucks are the main mean for hauling earth material within and outside of the construction and open-pit mining jobsites. The real-time monitoring of the material transportation trips is beneficia

    Aug 1, 2013

  • CIM
    Technical Advancements Towards Achieving 1500 T/a Production Rate At The Honeymoon Isr Operation

    By A. Rao, J. A. Davidson, B. L. Jones, K. W. Bowes, D. Craib

    Supported by ANSTO, Groundwater Science and Inception Consulting Engineers, Boss has embarked on a series of technical projects aimed at reinforcing the Project’s capability to meet its export permit

    Jan 1, 2020

  • CIM
    Integrated seismic reflection and borehole geophysical studies at Les Mines Selbaie, Quebec

    By E. Adam, B. Milkereit, M. Salisbury, L. E. Reed, G. Perron

    Integrating seismic reflection, borehole geophysical, and physical rock property studies is an effective means of mapping lithological contacts and structures in the crystalline crust. At Les Mines Se

    Jan 1, 1997

  • CIM
    Dust Research 1n West Germany

    By T S. Cochrane

    This paper is based on observations made during a recent visit by the writer to three of the dust research laboratories .in West Germany, each .of which is mainly concerned with studymg the compositio

    Jan 1, 1964

  • CIM
    Twelve Months' Milling at Noranda

    By C. G. McLaughlan

    The Noranda concentrator was placed in operation in October, 1928, and the object of this paper is to outline operations during the twelve months which have elapsed since that time. The ores milled

    Jan 1, 1930

  • CIM
    The Treatment of Complex Zinc-Lead-Copper Ores in the Imperial Smelting Process

    By D. A. Temple, G. O. John

    Until recently, the approach to the problem of treating complex ores bas been to produce, insofar as is possible, mono-metal concentrates which are treated in traditional zinc, lead and copper smeltin

    Jan 1, 1971

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015

  • CIM
    The Renzy Copper-Nickel Mine 197 Days to Production

    By R. M. Kleine

    In the fall of 1968, Sheridan Geophysics leased the Renzy Mine property 50 miles northwest of the town of Maniwaki, Quebec. A 500-tpd flotation mill was dismantled at Belleterre, Quebec, trucked into

    Jan 1, 1970

  • CIM
    Coal 1n Western Canada and Its Uses

    By M. M. Williams

    WESTERN CAN ADA'S coal industry has experienced a serious set-back since 1949, following a pattern well known to its counterpart in the United States. The loss in coal markets in Western Canada h

    Jan 1, 1958

  • CIM
    Description of pillar behaviour at Heath Steele Mines

    By Donald E. Archibald, Gerald A. Allcott

    "Noranda's Heath Steele Mine is located 35 miles north of Newcastle in northern New Brunswick. Blasthole open stoping with partial delayed filling is the major mining method in use. The selection

    Jan 1, 1981

  • CIM
    Factors affecting the viability of Canada's copper producers

    By W. J. S. Craigen, G. E. Wittur

    "In the context of today's continuously changing world, there are many factors which must be considered when attempting to assess the ability of Canada's primary copper producers to remain c