Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of a Process for the Treatment of Electric Arc Furnace Dust and Other Urban Mining WastesBy T. Hofbauer, M. J. Dry, G. B. Harris, C. W. White
"Urban Mining is a term that is increasingly being used, and represents an appreciable source of secondary materials for the metals extraction industry, a source that does not incur mining costs, but
Jan 1, 2014
-
Analysis of the Effect of the Tyresense Tire Monitoring System on Tire Performance: A Case StudyBy S. Klingmann
ABSTRACT In this paper, we used data collected from the Gibraltar mine to analyze the effect of the TyreSense tire monitoring system on tire performance by reducing tire wear and preventing premature
Jan 1, 2014
-
BRAZIL - The Vazante Zinc Mine, Minas Gerais, Brazil: Constraints on Willemitic Mineralization and Fluid EvolutionBy Rodnei Graça, Jorge Silva Bettencourt, Lena Virgínia Soares Monteiro, Baruch Spiro, Tolentino Flávio De Oliveira
Abstract - The Vazante Mine is located in the Vazante District, the largest zinc district in Brazil. The Vazante deposit consists dominantly of an unusual willemitic ore. Small sulfide bodies are tect
Jan 1, 1999
-
Resource developments on Indigenous Lands in Australia: The James Price Point Gas PrecinctBy Margaret Anne Stephenson
Today, in Australia, it is increasingly common to see agreements between Indigenous peoples and resource companies being achieved generally as Indigenous Land Use Agreements or agreements pursuant to
Aug 1, 2013
-
Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc PlantBy B. Krysa, J. Qiu
The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe
Jan 1, 2008
-
Project Environmental ApprovalBy B. R. Boardman
Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar
Jan 1, 1978
-
Heavy mineral by-products from Athabasca tar sandsBy Lloyd W. Trevoy
Syncrude Canada Limited is presently studying commercial production of heavy minerals from plant tailings of the openpit A lhabasca tar sands operation. When tar sands are processed and upgraded to sy
Jan 1, 1984
-
Application of Huate® New Style Elutriation Electromagnetic Separator in Magnetite Beneficiation TechnonogyBy Shichang Liu, Hongli Jia, Zhaolian Wang, Maotang Liu, Ltd. Shandong Huate Magnet Technology Co., Fengliang Liu
"Introduce and promote a latest technology and equipment for magnetite. It’s featured of purifying concentrate, lowering tailing grade, high concentrate recovery rate and stable operation. HUATE® New
Jan 1, 2016
-
Wastewater Treatment at Hudson Bay Mining and Smelting Company Limited, Flin Flon, ManitobaBy R. V. Typliski, G. J. Labarre
"Hudson Bay Mining and Smelting Co., Limited, Flin Flon, Manitoba, Canada, has developed a metallurgical wastewater treatment system employing two-stage lime neutralization, sludge recirculation and c
Jan 1, 1980
-
Passive Biologically Based Anaerobic Treatment Systems For The Removal Of Metals ? An Overview Of Current Research With ExamplesBy A. G. Mattes
This paper presents an overview of passive, engineered, biologically-based anaerobic bioreactor (ABR) treatment systems of the sort that can be used to remove dissolved copper from mine wastewaters. T
Jan 1, 2007
-
Discount rates and risk assessment in mineral project evaluationsBy Lawrence Devon Smith
"The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied
Jan 1, 2003
-
Effective production monitoring in open pit mines: Beyond the technologyBy P. L. Richard
An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren
May 1, 2004
-
Effective production monitoring in open pit mines: Beyond the technologyBy P. L. Richard
An open pit a mine can be thought of as a business unit, with capital, operating and maintenance costs that exceed those of many large business enterprises. Truck-and-shovel operations have an inheren
Jan 1, 2004
-
Low-gravity separation - Part 1By B. W. Clyburn
"Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing all essential properties to provide metallurgical coal,
Jan 1, 1985
-
Monitoring and targeting of plant utilities at INCO Limited, Sudbury, Garson MineBy D. Pacey
"This paper reviews the installation, start-up, and operation of a comprehensive monitoring and targeting management technique in which all plant utilities (i.e., electricity, natural gas, compressed
Jan 1, 1997
-
CSR Adoption in the Global Mining Industry: Explaining Convergence and DivergenceBy Hevina S. Dashwood
This paper proposes to build on my previous research (Dashwood 2012), which analyzed how and why the norm of sustainable development became institutionalized in the global collaborative corporate soci
Aug 1, 2013
-
Application of Skarn Deposit Zonation Models to Mineral ExplorationBy Lawrence D. Meinert
Abstract-Most large skarn deposits are zoned in both space and time relative to associated intrusions. Zonation occurs on scales from kilometers to micrometers, and reflects infiltrative fluid flow, w
Jan 1, 1997
-
Dry Slag Granulation: A Path to Improving the Safety and Sustainability of the Metallurgical SectorBy G. Chahal, L. C. So, S. Faucher, S. Mostaghel, S. -Y. Oh, S. K. Lee
Slag dumping and water granulation are the most commonly used slag treatment methods in the metallurgical industries. In both processes, water is present (by desire for cooling and dispersion or as a
Jan 1, 2015
-
The Impact of Operating Cost on Life-of-Mine Costs of Hydrometallurgy FacilitiesBy J. R. Porter, C. Panaou
"A significant effort is expended on preparation of the capital estimate for feasibility studies. The development of the operating cost estimate is usually allocated a significantly smaller budget and
Jan 1, 2012
-
Mount Milligan Mine Performance UpdateBy B. Simonian
"The Mount Milligan mine, located in central British Columbia, began operation in September 2013 with a design nameplate capacity of 62,500 dry metric tonnes per day, using a conventional SABC grindin
Jan 1, 2019