Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Hydrometallurgical Processing of Copper Ores ù Heap Leach, Solvent Extraction and Electrowinning at Girilambone Copper Company

    By J L. Bos, D J. Readett

    As mining progressed through the Girilambone oxide orebodies, down to the primary sulphide zones, each successive stratiform layer yielded copper bearing ores of changing mineralogy and grade. Constan

    Jan 1, 2000

  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    Acid Rock Drainage Management at the Ok Tedi Mine, Papua New Guinea

    By H Kundapen, J J, C Rumble, S Miller

    This paper describes measures taken by Ok Tedi Mining Limited (OTML) to minimise the risk of acid rock drainage (ARD) resulting from mining operations at its Mt Fubilan porphyry copper-gold mine in th

    Jan 1, 2003

  • AUSIMM
    A Mathematical Model of the Sirosmelt Process

    By Denholm WT

    A mathematical model has been developed for intense pneumatic smelting processes, such as the Sirosmelt group of processes, to assist in establishing optimum process conditions and to permit oper

    Jan 1, 1984

  • AUSIMM
    Exploration Techniques for Platinum Group Metals in Papua New Guinea

    By Collins AR, Meares RMD, Graham JM

    Exploration programs for both alluvial (placer) and hardrock platinum group metal deposits are being conducted in Papua New Guinea by a joint venture between Degussa AG and Pancontinental Mining L

    Jan 1, 1987

  • AUSIMM
    Two Stage Iron Purification of Zinc Plant Solutions

    By Kershaw MG

    At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec

    Jan 1, 1985

  • AUSIMM
    Concentration of Fine Grained Heavy Minerals Using the Kelsey Centrifugal Jig

    By Waldram JT

    The Kelsey Centrifugal Jig incorpo- rates the principles of operation of a conventional mineral jig, at the same time utilising high centrifugal forces to extend concentration to very fine heavy m

    Jan 1, 1986

  • AUSIMM
    Plasma Enhanced Recovery of Alloying Elements from Slags, Wastes and Lean Ores

    By R F. Johnston, I D. Sommerville

    This paper presents an overview of the researches carried out in our laboratory on the application of plasma in recovery of alloy elements from waste slags and the treatment of lean ores, which are ex

    Jan 1, 2000

  • AUSIMM
    Managing Seismic Hazards in a Narrow Vein Underground Operation

    The Kundana underground narrow vein gold mine had a recent history of large and damaging seismic events. Following a period of seismic events on 30 July 2001, in which nine miners were temporarily ent

    Jan 1, 2005

  • AUSIMM
    Factors Affecting the Sizing of Gas Ranges

    Existing fluid flow techniques may be readily applied to the design of ranges for seam gas drainage. The Reynolds number characterises the flow regime within the pipe and it can be used in conjunc

    Jan 1, 1982

  • AUSIMM
    From Darkness into Light: A Development Initiative

    By Choulaj D

    Mining and petroleum continue to be the two most vita components of our nation's development, says Sir Julius Char in the Australian Journal of Mining (Nov-Dec 1996). In fact the} account for

    Jan 1, 1997

  • AUSIMM
    Going Deeper - Has Your Mine Plan Fully Considered Ventilation?

    By P Gardner

    The Kanowna Belle gold mine in Western Australia has reached a depth of 1000 m on the way to 1300 m. A feasibility study undertaken in 2006 identified the mining of E-Block as both technically and com

    Jan 1, 2008

  • AUSIMM
    Gas Power Generation at the Sons of Gwalia Mine, W.A.

    By Dunstan N, Valentine C

    Gas power was first used on the Sons of Gwalia mine in January 1911, when a twin-cylinder Crossley engine of 167 hp was installed to belt-drive a 112 kw 550-volt ac generator. This engine was connecte

    Jan 1, 1932

  • AUSIMM
    Tracking and Quantifying Value - From æMine to Mill ÆImprovement

    By S Morrell, D Clark

    æMine to MillÆ improvement involves optimising the chain of rock breakage processes from the in situ rock in the mine to the output of the concentrator. A growing number of paper studies and case hist

    Jan 1, 2002

  • AUSIMM
    Minimising Coal Edge Losses in Dragline Blasting Operations

    By Yang RL, Bailey ML

    During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams

    Jan 1, 1988

  • AUSIMM
    Some Aspects of Loss Control

    During the 22 years that Isa Mine has been formally involved in accident prevention, it has succeeded in reducing its lost time injury frequency rate by 70 per cent. At present its performance com

    Jan 1, 1975

  • AUSIMM
    Development of a Process Simulation Package for Mineral Processing Plants

    By Riley TW

    This paper describes a Process Simulation Package for modelling the steady-state operation of a mineral processing plant. There are two levels of input allowed into the package. The first allows simpl

    Jan 1, 1985

  • AUSIMM
    Some Simple Graphical Methods for Reliability Analysis in Mines

    By Granholm S

    The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the fields of maintenance and operational reliability of capital intensive mining equipment.

    Jan 1, 1991

  • AUSIMM
    Effects of Ventilation Leakage in Deep, Hot Room and Pillar Operations

    By S Bluhm, R Funnell

    Creative mine-designs are constantly being applied in the deep platinum mining industry in South Africa. Recently, this has resulted in deep hot mine-designs including room and pillar, bord and pillar

    Jan 1, 2005

  • AUSIMM
    Panel Caving Experiences and Macrotrench (Macrozanja) - An Alternative Exploitation Method at the El Teniente Mine, Codelco, Chile

    By P Tobar

    The development plan (long-term plan) of El Teniente Mine, Codelco-Chile, includes 100 per cent primary ore, located at increasing depths, which may involve several difficulties related to the applica

    Jan 1, 2000