Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developments to Enhance the Productivity and Cost-Effectiveness of Large Rotary Blasthole Drills

    The on-going technical developments to enhance the productivity and cost effectiveness of large blasthole drills incorporate many of the blasthole drilling operating experiences garnered over the past

    Jan 1, 1992

  • AUSIMM
    Rapid Sealing with Parachute Stoppings

    By Buizen M, Eagleton A. C

    The results of calibration trials conducted on parachute stoppings both overseas and in Australia under a recently completed NERD&DC grant, are presented. Applications of parachute stoppings, for

    Jan 1, 1988

  • AUSIMM
    The Benefits of Computational Modelling in Improving Iron Ore Production and Processing

    By M P. Schwarz

    A major issue presently faced by companies producing and processing iron ore is the need to maximise throughput while minimising capital expenditure. While present high demand means this is of prime i

    Jul 11, 2011

  • AUSIMM
    Geophysical Exploration in the Search for Oil in Australia

    Although geophysical methods of prospecting have proved indispensable in the search or oil deposits elsewhere; it is only 'in recent years that they have been used to any significant extent in Au

    Jan 1, 1962

  • AUSIMM
    Safety Legislation and its Effectiveness (ac5e8ac3-fdc6-4268-ac21-d01fd1825ebf)

    By Golledge P

    Safety legislation has a long history and widespread application, but how can one test its effectiveness? One way is to examine safety statistics. Another way is to compare the legislation with pri

    Jan 1, 1975

  • AUSIMM
    Vertical Zoning of Gold-Silver Tellurides in the Emperor Gold Mine, Fiji

    An increase in the silver to gold ratio with increase in depth in the main ore shoot of the Crown- Crescent lode in the Emperor gold mine, Fiji, was found to be due mainly to vertical zoning of gold-

    Jan 1, 1980

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    HellyerÆs Innovative Escapeway

    By Will D. P

    A 328 m, 2.4 m diameter raise-bored shaft has been equipped with a modular ladderway system to provide a second means of egress from Aberfoyle's Hellyer Mine in Tasmania. The modular ladderwa

    Jan 1, 1988

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Increased Performance Through Flash Flotation and Cyclone Optimization

    By Rais SA

    In June, 1986, Freeport Indonesia, Inc., in conjunction with Out- okumpu USA, laboratory tested the Flash flotation concept on Primary ball mill underflow. These laboratory results indicated a possib

    Jan 1, 1988

  • AUSIMM
    Selection, Training and Performance Management

    There are three major human resource management activities which, depending on how well they are done, impact on the performance of people and therefore the bottom line. These are: ò recruitment; ò

    Jan 1, 1995

  • AUSIMM
    Technology Transfer to the Emerging Coal Mining Industry of Indonesia

    By Gillies A. D S

    Technology transfer is a vital requirement for increasing national capability of coal mine production in Indonesia. The term can cover the introduction of new equipment, facilities and processes and

    Jan 1, 1995

  • AUSIMM
    Vendor Consideration of Mineral Properties: Valuation from the Standpoint of the Independent Expert

    The paper reviews recent valuations of mineral properties, many of which are at an early stage of exploration. The various methods used are outlined. The problem of comparing, in terms of whether i

    Jan 1, 1994

  • AUSIMM
    Sidewall Fracturing in Coal Room and Pillar and Pillar Extraction Panels

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic model

    Jan 1, 1992

  • AUSIMM
    Towards 40,000 Tonnes/Day Workings

    By Vidalinc, Raffoux

    Longwall faces producing in the order of 20,000 tons per day of raw coal are presently running in the Houilleres du Bassin de Lorraine of Charbonnages de France. Production levels of twice that l

    Jan 1, 1988

  • AUSIMM
    Portable Data Collection in the Mining Industry

    By Churchill J

    A suite of software programs has been written to provide the field engineer or geologist with the capability to collect and store data directly into small, portable handheld computers. This allows

    Jan 1, 1986

  • AUSIMM
    Coal Geology - Where to From Here?

    By Hanna P

    Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are

    Jan 1, 1998

  • AUSIMM
    A Study on Stress Distribution and Reasonable Size of Coal Pillar in a Coal Face

    By Wang QP, Quan YH

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the

    Jan 1, 1992

  • AUSIMM
    Impact of Longwall Width on Overburden Behaviour

    By Grady PO

    The longwall panels at Clarence Colliery have experienced intermittent sudden weightings on the face that have caused some production delays. These weightings have typically been more severe on the wi

    Jan 1, 1998

  • AUSIMM
    Modification of Iron Blast Furnace Slag Using Sirosmelt Technology

    By Floyd JM

    Pilot plant trials showed the effective ness of the submerged lance SIROSMELT technology for altering the composition of iron blast furnace slags as a preliminary step to produc- tion of formed mate

    Jan 1, 1979