Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dynamic Links Between Geology and the Mining Process

    By J Vann, C Seymour

    Geology is generally treated as a æfront endÆ step in mine development. After infill drilling, the majority of resource estimation, mine-planning, development, mineral processing strategies and operat

    Jan 1, 2000

  • AUSIMM
    Computer Control of Grinding and Flotation at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited

    The philosophy of computer control of grinding and flotation at ZC/NBHC is presented. The performance and reliability of the in- stalled systems are discussed.

    Jan 1, 1978

  • AUSIMM
    Timbering Methods at the North Mine - North Broken Hill Limited

    The, Ore-bodies.-The ore-bodies of the North mine, North Broken Hill Ltd.; consist of two lenses, connected by a narrow neck of mineralized country. They pitch at an angle of 40° in an easterly d

    Jan 1, 1940

  • AUSIMM
    Discussion of the Results of Coal Drilling at Mount Davy

    This paper will be a discussion of the geological exploration and drilling carried out on the Mt Davy Block, Greymouth Coalfield. A brief summary of the geology of the Greymouth Coalfield will be giv

    Jan 1, 1979

  • AUSIMM
    The Rosebery Mine Underground Refrigeration Project

    By G Newling

    Zinifex Rosebery Mine is a lead-zinc underground mining operation located at the base of Mount Black, on the West Coast of Tasmania. Mining activities at the Rosebery Mine have been undertaken for ove

    Jan 1, 2008

  • AUSIMM
    Operation of Filter Presses for Tailings Dewatering

    By D Pepper

    Despite the limited literature regarding the pressure filtration of mine tailings (compared to the large number of papers published each year on paste thickening of tailings) the number of mines dry s

    Oct 29, 2012

  • AUSIMM
    Comparative Ore Reserve Methodologies for Gold Mine Evaluation

    Some of the major factors affecting ore reserve estimation in gold mines are discussed together with their impact on computational methods.The major priority in ore reserve estimation is to get sampli

    Jan 1, 1984

  • AUSIMM
    Managing Mining Contracts

    Contractors have penetrated all areas of the Australian mining industry over the last 15 years. The process started in the WA gold and nickel mines and has since spread around the nation to iron ore,

    Jan 1, 1998

  • AUSIMM
    Geotechnical Management at the Martha Pit

    Subsidence issues associated with historic mine workings have highlighted the need for enhanced geotechnical management of the Martha pit over the remaining life. In conjunction with a detailed analys

    Jan 1, 2004

  • AUSIMM
    Mount Isa Mines Limited Activities and Responsibilities Mechanical Engineering Department

    The organization of this department is as shown in the following chart:Chief Mechanical EngineerPowerGenerationWorkshopsNew ConstructionMaintenanceTransportCommunity ServicesMineMillSmelterDesign and

    Jan 1, 1953

  • AUSIMM
    Linking the Values of Water to Sustainability

    The value of water is defined by its marginal utility. Challenges arise where the marginal utility is difficult to estimate. Therefore, when two or more interested parties wish to access water and the

    Jan 1, 2006

  • AUSIMM
    Modern Gold Plants - A Design Overview (33de825a-0fcd-4290-b963-6a155bcc39af)

    By Lynn DR, Wadley GB

    The Australian gold industry has made large steps forward in the last few years. This progress has been driven by improvements in mining and processing technology, the high price of gold and by a favo

    Jan 1, 1990

  • AUSIMM
    Simulation of Copper Ore Handling at ISA Mine

    By Ruffles B. R

    A computer simulation has been developed to model the flow of copper ore in Isa Mine. It simulates extraction of copper ore from the 1100 orebody by load-haul-dump (LHD) units to ore passes, haulag

    Jan 1, 1974

  • AUSIMM
    Orebody Definition and Optimisation

    The importance of orebody definition and optimisation in project development cannot be overstated. Inappropriate orebody definition is the single most important reason for project under performance

    Jan 1, 1997

  • AUSIMM
    Specific Gravity of Ores

    Every estimate of ore reserves necessarily contains an assumption in regard to the specific gravity of the ore. This assumed figure may be based on experimental data, on textbook data, or on a reconci

    Jan 1, 1940

  • AUSIMM
    Like Liquid Gold ù Towards a Resource Industry Position on Water

    Launching the Queensland Water Plan 2005 - 2010 in August 2005, Premier Peter Beattie compared the stateÆs water resources with liquid gold. QueenslandÆs peak industry body for the minerals and energy

    Jan 1, 2006

  • AUSIMM
    On Bounding Techniques for the Optimum Pit Limit Problem

    By Giannini L. M

    The determination of the "optimum pit limit" of a mine has long been considered as a fundamental problem of mine planning. A number of mathematical techniques have been proposed to solve thi

    Jan 1, 1985

  • AUSIMM
    Environmental Planning In Victoria

    The paper briefly discusses the benefits to proponents of a formal environmental assessment process. It is argued that any process should be fair, cost effective and efficient, involve all affected pa

    Jan 1, 1992

  • AUSIMM
    Sustainability of the Flooding of Lignite Mining Lakes as a Remediation Technique Against Acidification in the Lusatian Mining District, Germany

    By W Uhlmann, U Grnnewald, B Nixdorf

    Flooding with surface water is the preferred technique for the abatement of acidification from pyrite oxidation in the lakes of abandoned Lusatian lignite mines. However, water resources of the region

    Jan 1, 2003

  • AUSIMM
    The Operation and Interaction of Grates and Pulp Lifters in Autogenous and Semi-Autogenous Mills

    By S Latchireddi

    Close circuiting autogenous and semi-autogenous mills is anenergy efficient way of grinding and a number of operations haveutilised this in the design of their comminution circuits. Owing tothe large

    Jan 1, 2001