Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Infrastructure Requirements for Underground Cave Mining Operations

    By A G. L Pratt, G F. Dunstan, A Leonforte

    The selection of the material sizing and mine dewatering systems are important elements in the development of a large-scale, high tonnage (greater than 4 Mt/a) underground hard rock mine. The sizing s

    Jan 1, 2008

  • AUSIMM
    The Australian Minerals Sands Industry A Financial Perspective

    By Baohm C, Barker T

    There have been significant changes in the Australian mineral sands industry in recent years due to changing supply and demand conditions, new product opportunities and opportunities for rational

    Jan 1, 1986

  • AUSIMM
    An Experimental Investigation of Deep Cutting Forces in Artificial Rock

    By Mostyn G

    In the last three decades various theories have been presented to allow the estimation of the force required to cut rock. These have generally relied on an hypothesised mechanism of chip formation.The

    Jan 1, 1993

  • AUSIMM
    Towards Larger Flotation Machines

    Economic and technical reasons forced the mining industry all over the world to increase the unit size of mineral processing equipment. in large flotation cells, this development leads to problems

    Jan 1, 1978

  • AUSIMM
    Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

    In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting

    Jan 1, 1987

  • AUSIMM
    The Use of an Agitated Bed of Particles as an Electrode System for Metal Deposition

    A number of suggestions have been made to improve the design of cells used for electro winning and electro refining of metals. Most of these designs have been aimed at increasing the current densit

    Jan 1, 1969

  • AUSIMM
    How Ore Deposits can be Overestimated Through Computational Methods

    By Watson DF

    Calculation of the amount of metal in an ore deposit or mining block should be approached by multiplication and integration of appropriate numerical manifolds describing the spatial distribution of

    Jan 1, 1987

  • AUSIMM
    Operations of a Low Grade Nickel Sulphide Mine, Nikkel og Olivin, Northern Norway

    At the Nikkel og Olivin nickel mine near Narvik, Norway, Outokumpu has been the operator since 1993. The mine was opened in 1989 and in 1992 Outokumpu commenced operations to secure concentrate del

    Jan 1, 1996

  • AUSIMM
    Controlled Recirculation in South African Gold Mines

    Controlled recirculation of nine ventila- tion air is becoming an acceptable practice world-wide. A brief review of operating and planned schemes is given which illustrates the various purposes for

    Jan 1, 1988

  • AUSIMM
    Stability Control and Monitoring in Deep Latrobe Valley Open Cuts

    By Fraser CJ

    Stability control plays a prominent part in the planning and execution of coal winning in the deep open cuts in the Latrobe Valley operated by the State Electricity Commission of Victoria (SECV). D

    Jan 1, 1982

  • AUSIMM
    The Development and Operation of an Indonesian Open Pit Coal Mine

    By Chia A. H

    This paper presents an overview of the development and operation of the PT Adaro Indonesia coal mining project. This operation is an initial two million tonne per annum mine, located in South Kalimant

    Jan 1, 1992

  • AUSIMM
    Golden Pig Mine Case Study

    The Golden Pig Mine is wholly owned by Bunnine Operations Limited and is located in the Yilgam Goldfields at Southern Cross, Western AustraliaThe paper briefly describes the geology and history of the

    Jan 1, 1993

  • AUSIMM
    Optimisation of Rotary Drilling

    Optimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad

    Jan 1, 1995

  • AUSIMM
    Pilot Tunnel and Blast Enlargement for Vibration Control

    By Lunardi P, Pelizza S

    The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section

    Jan 1, 1987

  • AUSIMM
    Applied Mineralogy in the Evaluation and Processing of Australian Iron Ores

    Australia contains a variety of iron ores, differing in grade, chemistry, size distribution and genesis. While a proportion of this ore is used world-wide as blast furnace lump, much of the material

    Jan 1, 1989

  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Coal Usage in the Cement Industry

    Pulverised coal firing was pioneered in the cement industry prior to the turn of the century. Ash from the coal is absorbed into the mix in the kiln and replaces secondary materials. With high pur

    Jan 1, 1987

  • AUSIMM
    Banded Iron Formation to High-Grade Iron Ore - The Fallacy of Supergene Enrichment

    Martite-goethite high-grade iron ore deposits that show no trace of hydrothermal alteration may extend to more than 200 m below the permanent water table and are typically saprolite with evidence of e

    Jan 1, 2008

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada (8470714d-c97b-4a7f-bf25-8340c867ad44)

    By Simmons SF, Fleming J

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophy

    Jan 1, 1995

  • AUSIMM
    The Application Of Bore Core Data To Coal Preparation Plant Design

    By Arnold J. J

    The design of a coal preparation plant using bore core data cannot be discussed without some reference to the wider considerations of design. A thorough knowledge of coal preparation processes and

    Jan 1, 1977