Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An electrochemical and spectroscopic study of the leaching mechanisms of enargite and chalcopyrite in sulfuric acid

    By Y L. Ma, M Chen, W Bruckard

    With the extensive exploitation and gradual depletion of high-grade copper reserves, the mining industry is paying more and more attention to the hydrometallurgical extraction of copper from lowgrade

    Aug 24, 2022

  • AUSIMM
    Pilot Plant Scale Leaching of Zinc From Angouran Plant Flotation Thickener Overflow Using Sulfuric Acid

    By S Moradi

    The thickener overflow of zinc concentrate, obtained from flotation process in the Angouran plant located in Iran, contains a large quantity of slimes which were transferred to the tailing ponds. Thes

    Jan 1, 2004

  • AUSIMM
    Operations at Mount Charlotte

    The, Mount Charlotte orebody contains' 5,000 tons per vertical foot-Of'quartz gold ore at an estimated ore reserve grade of )just 'over' 3 'dwt. per ton, Production from it

    Jan 1, 1964

  • AUSIMM
    Discovery of the Hamersley Iron Deposits (Duck Creek - Mt.Pyrton - Mt. Turner Area)

    By Burks WG, Hughes FE, Muceniekas E, Whitcher IG

    The area containing the iron field, recognised by the writers, is part of an uplifted, portion of the 'Western Australian Plateau,' ranging in elevation from about 1,000 feet to about 30

    Jan 1, 1964

  • AUSIMM
    Ventilation Design and Practice at the Olympic Dam Mine, South Australia

    By Clarke B. N

    The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design a

    Jan 1, 1988

  • AUSIMM
    Optimising the Loading System of Gol-e-Gohar Iron Ore Mine of Iran by Genetic Algorithm

    By M Akbarpour, M Osanloo

    In mining industries, materials handling costs represent a significant component of the operational cost. A variety of methods have been applied in surface mine equipment selection in order to select

    Jan 1, 2007

  • AUSIMM
    Northparkes Copper-Gold Project

    By Stewart C. A

    The Northparkes copper-gold project is being developed in Central Western New South Wales approximately 30 km NNW of the town of Parkes and approximately 350 km west of Newcastle. The project is a j

    Jan 1, 1995

  • AUSIMM
    Technical Note - Blasting in Narrow Reefs

    Most of the gold reef mined today in South Africa is approximately 1 m in width with slopes about 30 m long. To prevent production interruptions it is essential that the stopes should not be blasted i

    Jan 1, 1985

  • AUSIMM
    Technical Note on the Metering of Fine Powders at Low Flowrates

    By Turner T. M

    The problem of metering fine particulate material at low flowrate is often encountered in metallurgical experiment. This note describes a feeder which wa developed to provide metered flows of copper s

    Jan 1, 1978

  • AUSIMM
    Contributed Discussion to "The Nickel Copper Deposit at Radio Hill, Karratha, Western Australia" by De Angelis, Hoyle, Peters and Wightman (Bulletin and Proceedings Vol 292, June 1987)

    I offer some comments which might complement the valuable recent paper by De Angelis et al (1987), on the newly discovered nickel-copper deposit at Radio Hill.The authors have accepted subdivisions an

    Jan 1, 1988

  • AUSIMM
    Mechanical Devices Originated and Used at the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie, S.A.

    THE writer of this paper well realizes that the majority of engineering and metallurgieal works have from time to time evolved mechanical devices which are of great value as regards application in an

    Jan 1, 1922

  • AUSIMM
    Paper No. 188. A Graphic Method of Computing Mine Values.

    THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having

    Jan 1, 1911

  • AUSIMM
    Climate Change - Relative Solar and Anthropogenic Forcings

    The first thing to be aware of is that the warming effect of carbon dioxide is strongly logarithmic. Of the 3¦ that carbon dioxide contributes to the greenhouse effect, the first 20 ppm has a greater

    Jan 1, 2009

  • AUSIMM
    Exploration Success at the Martabe Gold Mine, Indonesia

    By P Albert, S Crispin, J Hertrijana

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Martabe gold mine is Indonesia’s largest precious metals-only producer and is also one

    Mar 18, 2015

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa

    By K Kuganathan, Y Potvin

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepe

    Jan 1, 1998

  • AUSIMM
    Laterite Ores - Nickel and Cobalt Resources for the Future

    Although laterite ores already provide a significant proportion of the world's nickel and cobalt production it is anticipated that they will surpass sulphide ores as a source of nickel in the n

    Jan 1, 1996

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983

  • AUSIMM
    Review of Analytical Methods for Determining Trace Amounts of Gold in Ores and Process Streams

    The accurate determination of trace level gold in ores, metallurgical samples and process solutions is required because of the value of gold, the efficiency of the cyanide leach process and because

    Jan 1, 1982

  • AUSIMM
    Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.

    THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,

    Jan 1, 1930

  • AUSIMM
    Results From Induced Polarisation Surveys Over the Beruang Copper-Gold Deposit in Central Kalimantan,Indonesia

    The Beruang Copper-Gold Deposit is located very near the centre of Kalimantan in Indonesia. It is a dacitic tuff hosted deposit currently being explored by Kalimantan Gold Inc of Canada. Exploration a

    Jan 1, 2004