Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Long Shaft ù A Deep Level Mining Success Story

    By G McLeay, T Moran

    Long Shaft has traditionally been seen as one of the most challenging mines in the Kambalda area with operations having been suspended by the previous owners in 1999. When mining recommenced in Octobe

    Jan 1, 2005

  • AUSIMM
    Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive Planning

    Determining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet

    Jan 1, 2001

  • AUSIMM
    Vision 2040 – Mining Technology, Policy and Market Innovation

    By D Giurco

    This paper presents the results from research undertaken in the CSIRO-funded Mineral Futures Collaboration Cluster on developing a future vision for the mining and minerals industry – Vision 2040 – in

    Nov 22, 2011

  • AUSIMM
    The Direct Outokumpu Nickel Smelting (DON) Process and the Harjavalta Expansion

    By MattelmSki M

    Outokumpu Harjavalta Metals Oy has been producing nickel since 1962, based on conventional flash smelting technology followed by electrowinning of nickel. In the 1980s, a research project was initia

    Jan 1, 1996

  • AUSIMM
    A Review of the Kapit Orebody, Lihir Island Group, Papua New Guinea

    By J R. Robinson

    Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio

    Jan 1, 2004

  • AUSIMM
    Flyrock Risk

    The issue of flyrock is critical to the operation of all mineral extraction sites that use blasting. This paper takes a risk-based approach to identifying, analysing and managing the flyrock hazard. T

    Jan 1, 2007

  • AUSIMM
    Valuing Mine Water - A South African Perspective

    Water is an integral and essential part of mining business. Two issues crucial in the management of this resource, scarcity and excess, are increasing awareness of the importance of water and changing

    Jan 1, 2006

  • AUSIMM
    Orebody Definition and Optimisation (Coal)

    Exploration of a coal deposit provides the data on which a range of mine plans can be developed during project feasibility. The stages of exploration use methods and procedures which initially outl

    Jan 1, 1997

  • AUSIMM
    Stability of Hydraulic Backfill Barricades

    Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe

    Jan 1, 1998

  • AUSIMM
    "Predicting Cu Species Classification Using Geochemistry at the Productora Cu-Au-Mo Deposit, Chile"

    By R Berry, A Escolme

    "Predictive geometallurgical models are being developed for the Productora Cu-Au-Mo deposit based on geochemistry to reflect variability in Cu species based on Cu sequential leach data (ie oxide, tran

    Jun 15, 2016

  • AUSIMM
    The PACMANUS Seafloor Sulfide Field, Eastern Manus Basin, Papua New Guinea

    By J M. Parr, C J. Yeats

    Discovered in 1991 by combined plume detection and bottom-tow photography (Binns and Scott, 1993) and for some years thereafter the highest tenor mineral occurrence known on the ocean floor, the PACMA

    Jan 1, 2008

  • AUSIMM
    The Implications of Blast-Induced Movement to Grade Control

    The sole reason for a mine to exist is to extract the finite mineral resource. Accurate grade control is critical to the economics of any mine. If grade control is not optimised, then no matter how go

    Jan 1, 2009

  • AUSIMM
    Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise Correlations

    By F Brenguier, R A. Lynch, G Olivier

    The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be

    May 9, 2016

  • AUSIMM
    Spontaneous Combustion Risk Management in Longwall Mining in New South Wales

    By J A. Shonhardt, I Porter

    All types of coal are liable to spontaneous combustion to a variable degree according to the inherent characteristics of the coal and also extrinsic factors. In order to successfully extract coal from

    Jan 1, 2003

  • AUSIMM
    Uranium Recovery From Highly Saline <i>In Situ</i> Leach Solutions by Ion Exchange

    By J Davidson

    Ion exchange using strong base resins is a well established technology for the recovery and purification of uranium from sulfuric acid leach liquors. Production of uranium at the Beverley Mine in Sout

    Jan 1, 2005

  • AUSIMM
    Multislice Longwalling for Thick Seam Extraction – Properties of Goaf in the Roof and Gate Roads Behaviour

    By Z Lubosik, S Prusek, M Plonka, B Syrek

    "The most commonly used method of thick coal seam extraction in Polish deep mines is multislice longwall (MSL). In MSL stability of goaf in the roof as a result of previous extraction in upper slice i

    Nov 5, 2014

  • AUSIMM
    Calibration of an Airblast Prediction Model

    By A J. Moore

    To control the airblast from blasting to regulatory limits at environmentally sensitive sites near the Collinsville Coal Mining Operations, it has been necessary for Thiess Mining to incorporate a wav

    Jan 1, 2004

  • AUSIMM
    The Concentrating Practice of the Broken Hill South Limited

    The concentrating plant of the Broken Hill South Limited was described in Proceedings No. 44, Australasian Institute Mining and Metallurgy, December, 1921, by Wainwright and Read. It was erected on th

    Jan 1, 1932

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    Infrastructure Development for the Ulan Project

    Extensive infrastructure construction works were required for the development of the underground and open-cut coal mine at Ulan to a production capacity of 5 million tonnes of steaming coal per an

    Jan 1, 1983