Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    Mine Hoists for the Nickel Rim South Project

    By T Gartner

    This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts

    Jan 1, 2005

  • AUSIMM
    Measuring the effect of hybrid classification in a pilot-scale test

    By M Hilden, K Barbosa, M Yahyaei, C Ndimande, K Runge, V Jokovic

    Classification devices provide a link between comminution and flotation. Basically, it determines which particles are diverted back for additional grinding and which ones pass to downstream flotation.

    Aug 24, 2022

  • AUSIMM
    The Influence of Molecular Structure of Ampholytic Polymers on their Behaviour and Flocculation Activity in Sedimentation Processes

    By Hoberg H, Schneider FU

    The stability of suspensions can frequently be controlled only by the use of supplementary polymeric agents. Such methods date back to the time of the ancient Egyptians, who used natural rubber as

    Jan 1, 1993

  • AUSIMM
    The Cannington Silver Lead Zinc Deposit - at Feasibility

    By M T Roche

    The Cannington deposit is one of the largest accumulations of silver-lead known. Located 135 km southeast of Cloncurry in North West Queensland (Figure 1), Australia, the deposit is currently in th

    Jan 1, 1994

  • AUSIMM
    The Introduction and Application of Carbon-in-Pulp in a Heap Leach Project

    By Mann LD

    The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro

    Jan 1, 1982

  • AUSIMM
    Geology and Tectonic History of the Palaeozoic Hodgkinson and Broken River Provinces, North Queensland

    By Donchak PJ, Lang SC, Hammond RL, Bultitude RJ

    The Hodgkinson and Broken River Provinces form the northern part of the Tasman Orogen. They are separated by a broad belt of Late Palaeozoic igneous rocks, but were probably originally continuous.

    Jan 1, 1987

  • AUSIMM
    New Zealand's Geological Framework

    By R L. Brathwaite

    The rocks of New Zealand can be grouped into three main elements: the Early to Mid Paleozoic Western Province, Late Paleozoic to Early Cretaceous Eastern Province, and several overlying Late Cretaceou

    Jan 1, 1997

  • AUSIMM
    Open stope design; beyond the Stability Graph

    By B McFadyen, Y Potvin, K Woodward

    The Australian Centre for Geomechanics (ACG) held two workshops in 2019—one in Australia and one in Canada—to discuss processes and methods currently used in the mining industry for stope design and r

    Mar 15, 2021

  • AUSIMM
    Electron Microprobe Mapping ù A Diagnostic Tool for Ilmenite Characterisation

    By C MacRae, N Wilson

    CSIRO Minerals has recently developed an electron microprobe (EMP) based imaging (or mapping) method for characterising ilmenite concentrates. The method requires an electron microprobe analyser to co

    Jan 1, 2001

  • AUSIMM
    The Flotation of Water-Soluble Minerals ù Peculiarities and New Technologies

    By V Novoselov, R Sabirov

    Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli

    Jan 1, 2005

  • AUSIMM
    Utilisation Technologies for Australian Iron Ore in China

    By D Duan

    In this study, aimed at two kinds of ore (lump ore and iron ore fines) and four types of Australian iron ore resources (haematite iron ore, Mara Mamba iron ore, limonite iron ore, and mixed iron ore,

    Jul 11, 2011

  • AUSIMM
    Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)

    By Wang J, Ma Y, Jia H

    The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t

    Jan 1, 1998

  • AUSIMM
    LPG Storage Cavern Blasting Techniques in Sydney Sandstone

    The project is undertaken by Elgas Pty Ltd, a 50 per cent joint venture between AGL and BOC, to store 65 000 t of LPG in underground storage at Port Botany, NSW. The contractor, Concrete Constructions

    Jan 1, 1999

  • AUSIMM
    Advancing Cut and Cover Tunnelling in Auckland – Experience Gained from New Lynn Rail Trench

    By M McDonald

    KiwiRail has a goal of significantly improving passenger rail services to west Auckland, as part of its DART (Developing Auckland’s Rail Transport) suite of projects. The New Lynn Rail Trench (NLRT) p

    Mar 8, 2011

  • AUSIMM
    Hydromechanical Processes During In Situ Coal Gasification

    By J Liu

    In situ coal gasification is a method of extracting a high proportion of the energy value from coal without the need for mining. In situ conversion of coal to combustible gases is achieved by drilling

    Jan 1, 2004

  • AUSIMM
    Responding to Risk by Going with the Top Ranking Performers to Achieve Sustainable Mining in a Global Industry

    The value of Australia's education services exports increased to over $15 billion dollars in 2009, placing education as the third overall export earner behind coal and iron ore; however there are

    Jun 1, 2010

  • AUSIMM
    Re-opening of Mining at Mt Lyell

    The Mt Lyell Mine at Queenstown, Tasmania was re-opened in 1995 by Copper Mines of Tasmania Pty Ltd, a wholly owned subsidiary of Mt Lyell Mining Co Ltd. The re-opening followed over 100 years of copp

    Jan 1, 1998

  • AUSIMM
    Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold Mines

    By M, C Silveira, C Ellice, D Christensen

    Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing

    Jan 1, 2003

  • AUSIMM
    Improving Pentlandite Pyrrhotite Separation at INCOÆs Clarabelle Mill

    By M Xu and, P F. Wells, A N. Kerr, Y Shields

    Triethylene tetramine (TETA) has been used in combination with sodium sulfite (sulfite) for pyrrhotite depression at Clarabelle Mill since 1998. This combination has been highly successful at reducing

    Jan 1, 2005