Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Using Ventilation Control Technology to Reduce Respirable Dust Exposures at US Metal/Non-Metal Mining Operations

    By J F. Colinet, G, J A. Zimmer, R J. Timko

    It has long been known that ventilation is a cost-effective method to lower respirable dust concentrations in all types of mining applications. The National Institute for Occupational Safety and Healt

    Jan 1, 2005

  • AUSIMM
    Recent Iron Making Topics in Japan

    By N Takamatsu

    The environments surrounding the iron and steel industry have changed greatly in recent years. Reported in this paper are the technologies adopted by the Japanese iron and steel industry to fititself

    Jul 11, 2011

  • AUSIMM
    In-Pit Tailings – World’s Best Practice for Long-Term Management of Tailings

    By G M. Mudd

    Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili

    Aug 8, 2011

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011

  • AUSIMM
    The CENIM_LNETI Process for Zinc Recovery from Complex Sulphides

    By Amer S, Novais A. Q, Limpo Gil J

    A proprietary hydrometallurgical ammonium chloride process for the recovery of not only zinc, but also copper, lead and silver from sulphidic zinc-rich concentrates has been developed at bench scale

    Jan 1, 1993

  • AUSIMM
    Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆ

    WMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchm

    Jan 1, 2000

  • AUSIMM
    Can æNovelÆ Ecosystems Offer Suitable Rehabilitation Alternatives for Post-Mined Landscapes?

    By P Audet, D R. Mulligan, D Doley

    This analysis attempts to reconcile existing ecological theories, rehabilitation planning goals and implementation constraints in the form of a rehabilitation paradigm that considers potential and pra

    Jul 10, 2012

  • AUSIMM
    New Mineralisation and Alteration Styles at the Porgera Gold Deposit, Papua New Guinea

    By J P. Richards, M D. Johnston

    The Porgera gold mine, located in the highlands of Papua New Guinea, produced 7.7 Moz of gold between 1990 and 1998. Reserves are estimated to be 12 Moz of Au. The deposit is associated with 6 Ma-old

    Jan 1, 1999

  • AUSIMM
    Mill Auto-Pilot at CSA Mines

    By A Thornton, D Engelhardt, J Woodg

    Grinding is a critical part of nearly all mineral processing operations. It is the largest consumer of energy on the mine site (and thus indirectly a producer of greenhouse gas through the generation

    Jan 1, 2004

  • AUSIMM
    Initiating-Systems for Underground Mass Firings Using Large Diameter Blastholes

    By Rashleigh C

    The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges

    Jan 1, 1978

  • AUSIMM
    Consolidation and shear strength of coal tailings slurries

    By D J. Williams, S Islam

    Worldwide production of black coal amounts to about 8 billion tonnes. Perhaps 20% of this annual production is washed to improve its quality, generating perhaps 250 million tonnes of coal tailings ann

    Jul 23, 2018

  • AUSIMM
    Upgrading the Gravity Circuit at Marvel Loch

    By W Newton, J Price

    This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of

    Jan 1, 2000

  • AUSIMM
    Peak Gold Mine - A Different Approach to Underground Mining

    By R H DAVIES

    Peak Gold Mine is a new gold and base metal mining project being developed by Enterprise Metals (a 100 per cent subsidiary of CRA) at Cobar in the centre of New South Wales. The Cobar district has a

    Jan 1, 1992

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Influence of Iron Bearing Carbonates and Reactive Iron Sulfides on Acid Rock Drainage Static Predictive Testwork

    By J Thoma, W Skinner, W Stewart, R Smart

    The acid neutralisation capacity (ANC) of rock sample containing significant iron carbonates and/or reactive framboidal pyrite can be a difficult parameter to determine. Results indicated that negativ

    Jan 1, 2003

  • AUSIMM
    Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.

    By Fallins J

    THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately

    Jan 1, 1930

  • AUSIMM
    Better Prediction of Performance of a Slope Using Time-series Monitoring Data at Multiple Points in a Multistep Excavation

    By L M. Zhang, X Y. Li

    Surface displacements are routinely monitored at multiple points during slope excavation. The monitoring data reveals the safety status of the slope under current loading conditions. They can be used

    Nov 5, 2014

  • AUSIMM
    Rehabilitation at the Macraes Gold Project: from Pit to Park

    Gold mineralisation at the Macraes Gold Project is hosted in the Hyde-Macraes shear zone and can be traced for ~30km along strike, although economic resources are confined to a 7 km section in the vic

    Jan 1, 2002

  • AUSIMM
    Long-Term Erosional Stability of Mine Spoils

    By Riley S

    Many regulatory bodies have, or are considering, guidelines that require rehabilitated mine spoils to be erosionally stable (satisfying quantitative limits) over specified design lifetimes. One of

    Jan 1, 1994

  • AUSIMM
    Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic Approach

    By J S. Kuszmaul, T O. Aspinall

    The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin

    Jan 1, 1998