Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    The Tolukuma Au/Ag vein system, Papua New Guinea

    By Semple DG, Leach TM

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The r

    Jan 1, 1994

  • AUSIMM
    Geology of the Esperanza Copper Deposit

    By Moy A. D

    The Esperanza deposit is located 120 kin N of Mount Isa, Queensland at approximately lat 19¦20'S, long 139¦22'E on the Camooweal (SE 54-13) 1:250 000 scale map sheet. It is one of several

    Jan 1, 1997

  • AUSIMM
    Geophysical Exploration and Space Age Technology

    The past decade hap seen revolutionary advances in com-munications and information-handling techniques which have been stiriulated by "cold war" military requirements and by, current programmes for pr

    Jan 1, 1963

  • AUSIMM
    Water and Soil Management Responsibilities

    Both the miner and the Regional Water Board have legal obligations to ensure that all discharges of water from a mine site are free of harmful wastes, and that proper authorisation is obtained to abst

    Jan 1, 1986

  • AUSIMM
    The Condensation of Aluminum Chloride Vapour in a Stirred-Bed Condenser (ca8bfe5e-d26c-4002-8bbe-e3590283e808)

    Applications of chlorine metallurgy to the extraction of metals often result in the production of volatile metallic chlorides, most of which condense directly to a solid phase at 1 atm pressure. A sti

    Jan 1, 1971

  • AUSIMM
    Geological and Geotechnical Characteristics of the Corridor Sands Deposits in Mozambique

    By H R. Pein

    "The Corridor Sands deposit is situated approximately 190 km north east of Maputo, Mozambique adjacent to the paleo-mouth of the Limpopo River. This deposit is one of the worldÆs largest known economi

    Jan 1, 2001

  • AUSIMM
    Mentoring - Fostering Relationships to Enrich Decision-Making

    Mother Nature controls, technical professionals model and miners decide. Decisions to explore, mine and mill. Mine decisions, mine design, planning and scheduling are subject to the quality of models

    Jan 1, 2006

  • AUSIMM
    The Golden Cross Closure Experience - A Success Story or a Work Without End?

    The Golden Cross is the first large precious metals mine to be both commissioned and closed in the æmodernÆ era in New Zealand. This paper discusses the life cycle of the Golden Cross mine, with empha

    Jan 1, 2006

  • AUSIMM
    Improving Colliery Performance Through One Big Team, Many Teams or.......???

    A cry that is often heard from front-line employees, particularly as a mine grows or circumstances change is "We used to be one big team but now they have set up teams for different functions - we don

    Jan 1, 1998

  • AUSIMM
    Radar-Based Surface Scanning with the World's First Fully Digital Beam Forming Technology Sensor Especially Developed for Mining Productivity and Safety

    By J Berg, M Hahn, R Winkel

    Imaging sensor systems designed for the mining and minerals industry incorporate different physical measurement technologies that can be used to detect the machine environment, such as laser, ultrason

    Sep 26, 2011

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Sampling of the Yeelirrie Uranium Deposit, Western Australia

    The discovery of economic uranium miner alisation in unique geological conditions at Yeelirrie, 700 km NNE of Perth, presented Western Mining Corporation Limited with a num- ber of sampling and eval

    Jan 1, 1976

  • AUSIMM
    Protection of ?Tunnels in their Future Environment

    By A L. Bennett

    It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi

    Sep 17, 2014

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Mineralogy and Textures of Vienna Wood Seafloor Hydrothermal Deposits in Manus Basin, Papua New Guinea

    By T Mizuta, D Ishiyama

    The Vienna Wood hydrothermal is hosted by mid-oceanic ridge type basalt in graben morphology and is located in the Central Manus Basin. The hydrothermal field is about 300 metres in diameter and consi

    Jan 1, 2002

  • AUSIMM
    The Composition of Some Lead Blast Furnace Slags from Port Pirie

    INDEX OF CONTENTSIntroductionThe slag samplesGranulated SlagGlass-spinel-magnetite-metallic leadRapidly Chilled SlagSlowly Cooled SlagSpinel - magnetite - zinc melitite (hardystonite) willemite - oliv

    Jan 1, 1949

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Environmental Assessment Of Derelict Mined Land, Emmaville, N.S.W.

    A survey of derelict and active alluvial tin and sapphire mines in the Emmaville area of northern N.S.W. as the first step in a pro- gramme of similar surveys to be undertaken throughout the State

    Jan 1, 1976