Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Identification and Spectral Characteristics of Hydrothermal Alteration on Landsat TM Imagery of North Chile

    This study examines the application of Landsat TM data to the identification of hydro- thermal alteration in the arid terrain of the El Salvador region of north Chile. Numerical reflectance values

    Jan 1, 1987

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    First Mexican Coal Mine Recovery After Mine Fire, Esmeralda Mine

    The fire started in the development section from methane released into the mine through a roof-bolt hole. The date was 8 May 1998. The flames spread quickly as the coal was ignited. After eight hours

    Jan 1, 2005

  • AUSIMM
    Female Undergraduates in the Mining and Minerals Industry

    By J Meikle

    A projected image is not always a true representation of a situation, or indeed an industry. This is often the case of the mining and minerals industry, which has frequently been portrayed in a negati

    Jan 1, 2006

  • AUSIMM
    Geotechnical behaviour of spent ore – impacts of metallurgical factors

    By R Rimmelin, C Vergara

    Heap leach pads are composed of mined ore, usually crushed, disposed on liners to be processed with leach solutions, and the tail of the process is called “spent ore” which are then transported by con

    Jul 23, 2018

  • AUSIMM
    Selecting and Implementing the Right Technology

    The selection and implementation of the right technology for a project is critical to the future development of the resource industry. It is essential for companies to ensure ongoing competitive viabi

    Jan 1, 2006

  • AUSIMM
    Successful Geostatistical Approach for a Nickel Ore Deposit – A Case Study for Nickel Laterite Deposit in Central I Pit, Kabaena Nickel Mine, Kabaena Island, Southeast Sulawesi, Indonesia

    By V Yadi

    Geostatistics has been widely used for more than four decades as a powerful tool in ore resource/reserve estimates and grade control. This method has gradually replaced the conventional method such as

    Aug 22, 2011

  • AUSIMM
    An empirical system for primary and secondary support in US coalmines

    By C Mark, Z Agioutantis

    This paper presents an empirical design methodology that is based on successful US roof support systems using both primary and secondary support in coal mining entries and intersections. The recent na

    Nov 29, 2022

  • AUSIMM
    The Business Case for Mine Closure Planning and an Overview of Anglo AmericanÆs Mine Closure Toolbox Approach

    By P R. Botha

    Mining has played a significant role in human development and without the mining sector, society would not enjoy a large number of the benefits that it does today. However, mining has also carried wit

    Jul 10, 2012

  • AUSIMM
    Gravity Gold - The Process of Change - ABSTRACT ONLY

    Employing gravity recovery for coarsely liberated gold and sulfide ores has potential to lead to a signifi cant reduction in the energy required for comminution and ultimately can have a significant i

    Aug 1, 2010

  • AUSIMM
    The experimental study on propagation of pressure wave in underground mine ventilation system

    By Y Shougu

    Many mine accidents will affect the mine ventilation system when they occur. At present, there is a lack of monitoring means to capture the occurrence of accidents in time by monitoring the ventilatio

    Oct 12, 2022

  • AUSIMM
    Geotechnical Input to the Porgera Gold Project, Enga Province Papua New Guinea

    By Mules GJ

    Geotechnical investigations have played a key role in influencing decisions for development of the Porgera Gold Project in the highlands of Papua New Guinea. Porgera is located 130 km west-northwest o

    Jan 1, 1990

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines

    By P Craig, A Crosky, H Ramandi, S Saydam, H Chen

    Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil

    Nov 30, 2018

  • AUSIMM
    Effect of slag composition on titanium distribution ratio between ferrosilicon melt and CaO-SiO2-Al2O3 slag at 1773 K

    By J H. Park, M J. Lee

    Because the environmental problems are occurred by greenhouse gases such as CO2, the industries have tried to increase electric motor efficiency to reduce CO2 emissions. A core material of electric mo

    Jun 19, 2024

  • AUSIMM
    Rating Dilution Risk at Pajingo Gold Operations

    By R Huntley, D Sims

    Pajingo gold mine produces over 240 000 oz Au per year from underground mining using longitudinal bench stoping methods with a 15 m sublevel interval. Average mine head grade is around 12 g/t Au, cont

    Jan 1, 2002

  • AUSIMM
    Auditing Resources and Reserves at Newmont Australia

    Risk management for resources and reserves includes examining the fundamental processes of data collection, interpretation, modelling and estimation. Newmont Australia has developed a procedures manua

    Jan 1, 2003