Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvals

    By C Tomlin, C Gimber

    Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation

    Aug 2, 2023

  • AUSIMM
    PMAP – smart and sustainable in situ treatment of mine wastewater and critical metals recovery technology

    By M Barkh, F X. Spachtholz

    The mining industry faces significant environmental challenges in managing tailing ponds and wastewater treatment, including the risk of contaminated water, breaches of tailing dams, and energy-intens

    Sep 1, 2024

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    A Novel Approach to the Characterisation of Iron Ores and Concentrates Using Recent Advancements in Wavelength- and Energy-dispersive X-ray Fluorescence Spectrometers

    By M Rayner, C Tsouris, A Komelkov

    X-ray fluorescence (XRF) is a widely accepted technique for the elemental analysis of iron ores and their concentrates. Wavelength-dispersive, or WDXRF, and energy-dispersive, or EDXRF, spectrometers

    Jul 13, 2015

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • AUSIMM
    Creating Value and Improving Environmental Performance by the Recovery of Valuable Products from Tailings from the Athabasca Oil Sands in Alberta, Canada

    Creating Value and Improving Environmental Performance by the Recovery of Valuable Products from Tailings from the Athabasca Oil Sands in Alberta, Canada

    Sep 13, 2010

  • AUSIMM
    Extractive Industry - Sustainability Information Systems

    As the title indicates the central themes discussed in this contribution are sustainable development, information systems, and extractive industry. More specifically, the objective is to present a pro

    Jan 1, 2009

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    Integrated multi-disciplinary auditing and benchmarking of catastrophic hazards for underground mining operations

    By A R. Penney

    Safety management, both personal and that associated with catastrophic hazard, helps to define the success of mining companies. Personal safety management, often categorised by slips, trips and falls,

    Mar 29, 2023

  • AUSIMM
    Current Tyre Maintenance Practices on Groote Eylandt with Particular Reference to Wabco 85C Dump Trucks

    By Dunlop JSF

    A description of general mining proced- ures and tyre maintenance practice is given with particular reference to tyre mainten- ance facilities and record keeping at Groote Eylandt. Experience with t

    Jan 1, 1982

  • AUSIMM
    Application of Lateral Crater Test in Open Pit Blasting Parameters Optimisation

    By Y M. Wang, W Z. Liu, L F. Li, X L. Zhang

    Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min

    Aug 24, 2015

  • AUSIMM
    Public reporting – new standards or no standards?

    By J Coombes, R Sterk

    The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating

    Sep 20, 2017

  • AUSIMM
    The Role of the New Zealand Minerals Industry Association

    The New Zealand Minerals Industry Association was incorporated as the NZ Mineral Exploration Association in 1982, with a membership that consisted of the gold exploration companies then active in

    Jan 1, 2006

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    Adaptive management in deep sea mining – looking like you know what you’re doing when it’s never been done before

    By R L. Grogan

    Regulators of deep-sea mining projects are becoming increasingly hesitant about the concept of adaptive management as a tool to facilitate compliance and continuous improvement. Adaptive management is

    Jul 25, 2018

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Implementation of Mine to Mill Blast Optimisation at Porgera Gold Mine

    By S S. Kanchibotla, D La Rosa, R W. Pesch

    The Porgera Joint Venture and Dyno Nobel have commissioned a joint project to optimise the drill and blast operations to increase the overall profitability of the mine. One of the aims of this project

    Jan 1, 2003

  • AUSIMM
    When the Portal is in the Sea - Design of the Marine Risers and Tunnel Connections for the Gold Coast Desalination Plant

    By W Angerer

    This paper describes the design of the marine riser structures, including the design measures for sealing and protection from flooding, dewatering and connection to the main tunnels, for the Gold Coas

    Jan 1, 2008

  • AUSIMM
    Managing the Ranger Uranium Mine in the Alligator Rivers Region-There is much more to this Business Enterprise than just Procuction

    This paper addresses the unique environ- mental programmes which prevail at Ranger and their importance in the future profitability, of Ranger Uranium Mines Pty Ltd. (RUM) Industrial relations, gene

    Jan 1, 1984