Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Oxygen in Matte and Oxidic Nickel in Slag

    A relationship is predicted between oxidic nickel in slag, oxygen in matte and Ni/Fe ratio in matte after the examination of thirty sets of contiguous matte and slag samples taken from industrial n

    Jan 1, 1979

  • AUSIMM
    The Cementation of Metals from Dilute Aqueous Solution

    By Lawson F

    A rotating disc geometry has been used to provide a uniformly accessible surface for a kinetic study of the cementation of the metals cadmium, lead and silver from dilute aqueous solutions. This work

    Jan 1, 1970

  • AUSIMM
    Real-Time Data Acquisition and Control Projects at the UDC Research and Development Laboratory

    By Fiedler VA, Threadingham GM, Leckenby DF, Clarkson CJ

    The Utah Development Company Research and Development Laboratory has embarked upon a programme of optimisation of the company's coal preparation plants. This goal is being accomplished in a t

    Jan 1, 1983

  • AUSIMM
    Mineral Investment-Resource Management and Policy Setting

    It is a privilege for me to participate in this vitally important discussion of The Role of Governments in the Management of Resources. The distinction of my fellow participants is evidence that t

    Jan 1, 1978

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    The Inclusive Management of Operating Risk, Efficiency and Organisational Dynamics at the Cosmo Howley Mine

    By Johnson G. D

    The typical management systems used to address the issue of operating risk centre around technologies that identify, analyse and evaluate the risk factors. These logical systems such as HAZOPs, Faul

    Jan 1, 1994

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)

    RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo

    Jan 1, 2007

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    The Discovery of Cold - Silver Mineralisation at Binebase, Sangihe Island, Indonesia

    By Alwan M

    At Binebase mineralisation is hosted within an andesitic Neogene volcaniclastic succession on Sangihe Island, Indonesia. Two major alteration types occur; an initial widespread phyllic assemblage of q

    Jan 1, 1990

  • AUSIMM
    The Contribution of Geology to Achieving Mining Performance at Hilton Mine

    By Dennis B

    The Hilton Mine, 20 km north of Mount Isa was discovered in 1947. The underground mine has been a significant producer from 1989. The long development history is the result of complex orebody geometry

    Jan 1, 1993

  • AUSIMM
    Percolation Leaching of Bornite Ore

    Up to 80 per cent of the copper in a bornite ore can be quickly leached with percolating acidified ferric sulphate solutions. The upper limit for rapid copper extraction is set by the conversion of bo

    Jan 1, 1973

  • AUSIMM
    Dense Medium Separation at Mt Newman

    The Mt Newman Beneficiation Plant uses a combination of heavy media deans, heavy medium cyclones and Reichert cones to produce saleable iron ore concentrates from low grade iron ores. The aim of t

    Jan 1, 1987

  • AUSIMM
    The Effect of Inter-Hole Timing on Heave

    By Grant J

    In surface mining, significant improvements in efficiency can be obtained through greater control over the formation of the muckpile. By tailoring the muckpile shape and its looseness to the requir

    Jan 1, 1988

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • AUSIMM
    Geology - Paper No. 7 Geology Of The C.S.A. Mine, Cobar, N.S.W.

    The C.S.A. copper lead zinc mine, located seven miles north of Cobar in Central Western New South Wales, is the largest known mineral occurrence in the Cobar Mining Field. Hosted by the steeply wes

    Jan 1, 1969

  • AUSIMM
    Geological Structure of the West Area Pit, State Coal Mines, Wonthaggi

    This paper is written as a supplement to that of Edwards, Baker and Knight on "The Geology of the Wonthaggi Coalfield" 1, the West Area pit being in an early developmental stage at the time

    Jan 1, 1953

  • AUSIMM
    Quantifying and Managing Environmental Financial Risk from Mining Operations

    This paper concerns a pragmatic approach to a problem that is common to many operations in the mining industry: how, over the short-term, to grasp the extent and distribution of long-term financial

    Jan 1, 1994

  • AUSIMM
    The Hearth Drainage of the Blast Furnace

    By Okabe K

    Development in the theory and practice of hearth drainage is reviewed. Difficulties in the hearth drainage were re- newed during late sixties and early seventies when the size of a blast furnace and

    Jan 1, 1981

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018