Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons Learnt

    By R Jacobs, J Yeates

    "The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat

    Mar 8, 2016

  • AUSIMM
    Waste batteries – are you prepared for the coming avalanche?

    By D Bush, F Goddard

    The electrification of Australian mine sites will see a boom in the use of batteries of all chemistries. Lead acid batteries, a traditional mainstay of the mining industry, are expected to nearly doub

    Apr 16, 2024

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Utilising Mineralised Mining Waste – Contributions to the Circular Economy

    By É Lèbre, G Corder

    The circular economy concept, as defined by the Ellen MacArthur Foundation (2015) and quoted by the recent International Council on Mining and Metals (ICMM) Guide to Responsible Sourcing, calls for sh

    Jun 28, 2016

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • AUSIMM
    Queensland Mines Plant Trials with Caro's Acid

    By Ring R. J, Waters D. J, Vautier F. E, Fulton E. J

    Laboratory leach tests have been carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's acid (permonosulphuric acid) as an alternative oxidant to pyrolusite

    Jan 1, 1983

  • AUSIMM
    Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community Relationship

    By N Boughen, K Moffat, L Brooks, A Zhang

    In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese

    Jun 28, 2016

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    Plant Practice at the New Celebration Gold Mine

    By Martins V, Dunne R

    A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D

    Jan 1, 1992

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Exploding the Myths ù A Case Study on Land Use Planning and Quarry Buffers

    By M Freeman

    In a visionary move, the Planning Commission and the Ministry for Planning in Western Australia decided to invite three extractive industry quarry operators, local government councils and State Govern

    Jan 1, 2001

  • AUSIMM
    How to Create a Perfect Storm

    By A Chadwick, J de Ross, C Adams

    Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea

    Nov 20, 2012

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    Magnetite – A Higher-grade Blast Furnace Feed and Its Potential Benefits for the Ironmaker

    By K Edwards, A J. J Mouton

    Hematite represents the vast majority of iron ore exported from Australia as the development and processing cost of magnetite is generally seen as a barrier to the development of vast magnetite resour

    Jul 13, 2015

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995