Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western AustraliaBy A Weeks, W J. Shaw, A Kuk
Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra
Aug 18, 2014
-
A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring LocationsBy J Loeb, D Thornton
Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste
Aug 18, 2014
-
Functional safety and behavioural economics – understanding human error risk in autonomous operationsBy B Patterson, Y Lanwin
Over the last decade the adoption of autonomous technology has proven its potential to fundamentally alter the mining industry, offering significant improvements in safety and productivity. Automation
Apr 16, 2024
-
Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters LimitedBy T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart
Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio
Aug 29, 2018
-
Fimiston Open PitBy Neill A, O&apos
The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim
Jan 1, 1991
-
Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practiceBy M Laxman, A Kundu
After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op
Jul 23, 2018
-
Modelling Blast Movement for Grade ControlBy O Handayani, R Barr, E Isaaks
The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los
Aug 18, 2014
-
Social Licence to Close?By J A. Braithwaite
Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib
Jun 28, 2016
-
Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, ColombiaBy S Leichliter
La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t
Sep 5, 2011
-
Metal Prices and the Differences between Forward and Consensus Pricing – Which One is Better for Use in a Discounted Cash Flow Model?By L A. Martinez Tipe, J McKibben, S Barry
"Metal prices are central to a mineral investment decision and have a profound impact on the financial performance of companies in the mining industry. At its most basic level, metal prices are influe
Mar 8, 2016
-
Experiences from developing a road map to attractive, inclusive and safe mining workplacesBy L Abrahamsson
The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili
Sep 1, 2024
-
The Financing and Development of the Nagamble Gold Mine, VictoriaThe Nagambie heap leach gold mine commenced production of gold in September, 1989. The mine,120km north of Melbourne in Victoria, Australia, was developed by Perseverance Mining Cor- poration Ltd, a
Jan 1, 1991
-
Thickening at Karara – The Role of Test Work and Innovative DesignBy G Hart
As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’
Jul 11, 2011
-
Implications of the Carbon Price and Developing a Carbon StrategyBy P Holt, M Allen
On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa
Nov 20, 2012
-
Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.
Nov 25, 2010
-
A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron OreBy J Planner
As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.
Nov 22, 2011
-
Underground Construction Challenges Associated with the Albany Conglomerate in AucklandBy L J. Strachan, O J. Hawes, S W. Crossen, R C. Roberts
The Albany Conglomerate is a widespread geological unit found in northern areas of Auckland, New Zealand. It has previously been described as part of the early Miocene Waitemata Group which underlies
Sep 17, 2014
-
A Laboratory Study of Gold Recovery from a Low-grade Tailings DumpA sample of tailings from a local, low grade (less than 2g/t) tailings dump was investigated for gold recovery. The tailings were very fine, with 90 per cent passing 30¦m and almost 60 per cent pass
Jan 1, 1991
-
New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith OperationsThe Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt
Jan 1, 2007
-
Maximising Productivity through Big Data, Simulation and Predictive AnalyticsBy M T. Grigoleit, M S. Schneider
The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher
Jul 13, 2015