Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geophysical blasthole sampling

    By C Simpson, J Market

    The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu

    Nov 8, 2021

  • AUSIMM
    Integrating Environmental Impact Assessment into Life-of-Mine Planning

    By J Jones, J Blunt

    "The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be

    Jul 10, 2012

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    Control System Improvement Through Alarm Reduction

    By R West

    The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont

    Jan 1, 2005

  • AUSIMM
    Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active Tailings

    By T Baumgartl, D Bradshaw, B Forsyth, M Edraki

    In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals

    Jul 10, 2012

  • AUSIMM
    The Status of Implementation of Proximity Detection Systems in Underground Mines

    By D Kent

    The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b

    Mar 21, 2011

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Use of Petrex Fingerprint Soil Gas Geochemical Technique in Multiple Scale Geothermal Exploration A Case History at Okuaizu Geothermal Field, Japan

    By Sakai S, Suga S, Bisque RE

    Soil gases were collected on activated charcoal, analyzed by computerized mass spectrometry and treated with multivariate statistical pattern recognition to determine the diagnostic geochemical si

    Jan 1, 1987

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Mine reconciliation standardisation – R Factor Series

    By R Hargreaves, T Elkington, W J. Shaw, G W. Booth

    Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions

    Mar 22, 2022

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Application of Different Drive Systems for Horizontal Mills

    By M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz

    Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee

    Jul 13, 2015

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016