Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geophysical blasthole samplingBy C Simpson, J Market
The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu
Nov 8, 2021
-
Integrating Environmental Impact Assessment into Life-of-Mine PlanningBy J Jones, J Blunt
"The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be
Jul 10, 2012
-
Advanced Technology for Setting Out of Blastholes and Measurement while DrillingBy D Xiong, G Xu, L Yao, F Wang, Y Duan
The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines
Aug 24, 2015
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
The Role of Benchmarking and Independent ReviewsBy D Hunter, N Cusworth, J Miller
"Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche
Mar 8, 2016
-
Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial resultsBy J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome
A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria
Jul 25, 2018
-
Health, Safety and SustainabilityBy D Cliff, K Bailey
Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im
Nov 20, 2012
-
Control System Improvement Through Alarm ReductionBy R West
The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont
Jan 1, 2005
-
Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active TailingsBy T Baumgartl, D Bradshaw, B Forsyth, M Edraki
In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals
Jul 10, 2012
-
The Status of Implementation of Proximity Detection Systems in Underground MinesBy D Kent
The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b
Mar 21, 2011
-
Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case StudyDuring underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses
Dec 6, 2010
-
Design of Air-Blast Plugs for a Sublevel Caving OperationThe Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav
Nov 25, 2010
-
Use of Petrex Fingerprint Soil Gas Geochemical Technique in Multiple Scale Geothermal Exploration A Case History at Okuaizu Geothermal Field, JapanBy Sakai S, Suga S, Bisque RE
Soil gases were collected on activated charcoal, analyzed by computerized mass spectrometry and treated with multivariate statistical pattern recognition to determine the diagnostic geochemical si
Jan 1, 1987
-
The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processesBy P Willems, J B. Crow, R Dale
Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a
Mar 22, 2022
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Mine reconciliation standardisation – R Factor SeriesBy R Hargreaves, T Elkington, W J. Shaw, G W. Booth
Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions
Mar 22, 2022
-
Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in AustraliaBy W Ludlow, C Harrington
This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed
Jul 23, 2018
-
Application of Different Drive Systems for Horizontal MillsBy M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz
Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee
Jul 13, 2015
-
New Continuous Production System in Block Cave Mining – the Rock Flow SystemBy M Frenzel
At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu
May 9, 2016