Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant Design

    By K B. Quast

    During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num

    Jan 1, 1998

  • AUSIMM
    Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)

    By M P. Murphy, C M. D Barton

    When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t

    May 24, 2023

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    The Real Cost Of Mining And Mineral Processing In Australia

    By Tapp B. A

    The minerals industry in Australia is currently regarded as the country's economic saviour; the bastion of economic security. As Fitzgerald (1974) stated, 'Australia's natural endowm

    Jan 1, 1980

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Supergene Iron Ore and Disorder

    By F R. M Pires, R M. Carvalho

    Supergene processes in banded iron formation (BIF) result in important dissolution, material transport and simultaneous disorder of the residual bands. The rock physical properties such as density, po

    Jan 1, 2002

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Improving Rehabilitation Outcomes using Biocrusts

    By S Doudle

    The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces

    Oct 5, 2011

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Microalgae in mining – environmental and social opportunities

    By A E. Levett, J Durbin

    The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c

    Aug 2, 2023

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Geostatistical Parametrisation for Grade Control of Stratiform Banded Iron Formation in 'Singhbhum - Keonjhar - Bonai' Belt of India

    By Sarkar B. C, Sen A. K

    India is well endowed with vast reserves of banded hematite ore, about 12 billion tonnes, estimated by some conventional methods. Various authors have assessed this huge reserve using some advanced

    Jan 1, 1995

  • AUSIMM
    Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metal

    By Y Zhang, Z Zhao

    The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t

    Aug 21, 2024

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • AUSIMM
    Geology and Ore Reserve Evaluation at Renco Mine, Zimbabwe

    Gold at Renco occurs in association with pyrite, pyrrhotite, chalcopyrite and quartz and is confined to a series of brittle fractures and fault breccias (reefs) preferentially developed within an anas

    Jan 1, 1990

  • AUSIMM
    Mining Geophysical Methods for the 21st Century

    To help meet the challenge of mine finding at the start of the 21st century, the exploration geophysicist will have at his command a powerful range of tools, some new, some improved, and some whic

    Jan 1, 1986