Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    Return to Hillgrove

    By C Dell

    Hillgrove, situated on the New England plateau of New South Wales, is an area rich in history and resources. Key resources are predominantly antimony, gold and scheelite and the area surrounding the h

    Jan 1, 2008

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the Resource

    By A M. Avis

    This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain

    Oct 5, 2011

  • AUSIMM
    Particle Size Distribution Effects that Should be Considered when Performing Flotation Geometallurgical Testing

    By K C. Runge, E Tabosa, A Jankovic

    Flotation recovery in geometallurgical modelling is usually predicted based on relationships developed from batch flotation testing of different ore types. These batch flotation tests are usually perf

    Sep 29, 2013

  • AUSIMM
    Real Option Value Optimisation

    By J Gould, T Elkington

    Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr

    May 24, 2012

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Ensure Your Fleet is Always Operating at its Top Efficiency Using Advanced Monitoring and Benchmarking Technology

    By Rogers R, Kinnane T

    In a typical open cast mining operation, investigation of how existing truck performance compares with the highest achievable truck performance is largely neglected. This paper addresses this issue

    Jan 1, 1994

  • AUSIMM
    Kwinana Nickel Refinery the First Year's Operation

    The history of the discovery and development of the Kambalda nickel orebody. is reviewed and the decision to process the Kambalda concentrates by the Sherritt-Gordon process at Kwinana is discussed.

    Jan 1, 1971

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    The Rapid Implementation of the Pine Creek Gold Project

    By Buttrose RB

    The Pine Creek gold mining development consists of a 1000000 tonne/yr open cut mine, a carbon-in-pulp processing plant and support facilities. The operation is located at Pine Creek, 230 km south

    Jan 1, 1986

  • AUSIMM
    Recruiting for an Underground Workforce at Cannington

    By A G. L Pratt, M S. Kemp

    BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to

    Jan 1, 1998

  • AUSIMM
    Underground Extension of the FGC Line in Sabadell through Cemented Soils

    By R Justa Cámara, J María Bertrán Llop

    "The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is

    Sep 17, 2014

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Gas Evolution Trends for Coal from Two Different Areas at Clarence Colliery

    By J Sargeant, T Levi, J Theiler, B Beamish

    Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper

    Aug 31, 2015

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic Separators

    By A Horn

    Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g

    Jul 11, 2011