Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • AUSIMM
    A New Technique to Combat Methane Gas Hazards

    By Forrester P. I, Richardson W

    Methane in coal mines is an ever present hazard resulting in loss of lives and serious economic consequences. For effective control of methane, ventilation alone may not be totally adequate in som

    Jan 1, 1988

  • AUSIMM
    Gravity Gold Recovery in Obuasi Mines

    Mining operations in the Obuasi mine of AngloGold Ashanti Limited began in 1897 using mainly gravity concentration and amalgamation to recover the gold from predominantly high-grade quartz ores. The m

    Aug 1, 2010

  • AUSIMM
    Geotechnical Aspects of Waihi Gold Mining Company's Open Pit

    Mining of the Martha Hill epithermal gold deposit via open pit methods will excavate a pit to 15 m below sea level. Regular geotechnical evaluations of pit slopes have taken place. Details of the vari

    Jan 1, 1991

  • AUSIMM
    Relocating Waihi's Cornish Pumphouse

    WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant

    Jan 1, 2006

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Northside Storage Tunnel Project

    By R J. Cuttler

    In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North

    Jan 1, 1999

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Limnological Processes in the Development of Acid Pit Lakes

    Limnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c

    Jan 1, 2003

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • AUSIMM
    Deep Paste Thickening Systems (Brisbane, 14 - 16 April1998)

    By Laros T, Schoenbrunn F

    Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critic

    Jan 1, 1998

  • AUSIMM
    Megathrusts, Megavalving and Mineralisation – Perturbation of Hydrothermal and Magmatic Flow Systems by Subduction Thrust Ruptures

    By R H. Sibson

    Magmatic and/or hydrothermal fluid systems in island or mountain arcs self-organise to critical states subject to perturbation by changes in the regional stress, which plays a controlling role in the

    Aug 22, 2011

  • AUSIMM
    Enhancing Zinc's Competitive Edge Through Co-operative Research

    ILZRO sights are locked securely on the targets of the expanded applications and ever-improving quality in the major market for zinc-coated steel. A wide range of ILZRO-sponsored research projects

    Jan 1, 1993

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By Harrison AT, Smart RM

    Backfill systems using unconventional cementitious hinders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two

    Jan 1, 1998

  • AUSIMM
    Effect of pebbles on collisional environment in a ball mill using composite media (balls/pebbles)

    By S Nkwanyana, I Govender

    Batch experiments in a 0.6 m diameter mill have shown that improvements of about 13 per cent in the efficiency of energy utilisation can be realised in ball mills by replacing 25 per cent of the ball

    Aug 24, 2022

  • AUSIMM
    Why is the Mineral Processing Field Behind in the Application of New Technology?

    Mineral processing is at the hub of the exploration-mining-metals production system. Because of the large volumes of material processed, incremental technology investments can pay off better than fo

    Jan 1, 1993