Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Project Controls for Large Mining Projects - The Client's Perspective

    Control of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf

    Jan 1, 1993

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    The Use of Ammonium Nitrate-Fuel Oil Blasting Agent at Great Boulder Mine

    To enable ammonium nitrate-fuel oil (AN-FO) to be used on an equal weight basis with nitroglycerine explosives, smaller diameter bore holes became necessary with consequent modifications to drill stee

    Jan 1, 1965

  • AUSIMM
    Failure Rate of Process Computers

    By Weber W

    Methods of calculation of the reliability of process computers are getting more and more important. The paper presents long period observations of 21 process computers with online applications in the

    Jan 1, 1985

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Deployment of Self - Contained Self Rescuers in Coal Mines

    By Baafi EY, Sun Y, Tague I

    Field trials at three New South Wales and one Queensland coal mines were carried out to gather data on oxygen "run out" times of Self-Contained Self Rescuers (SCSRs), time taken to escape from the min

    Jan 1, 1998

  • AUSIMM
    BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia

    Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a

    Jan 1, 1994

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed

    Jan 1, 1995

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads

    By Y Durkheim, P Saunier, L Ameglio

    "In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro

    Jul 27, 2015