Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial Implications

    By M D. Uttarwar, R R. Yerpude

    India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie

    Aug 24, 2015

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    High purity alumina and potash produced from feldspar

    By D Connelly

    High purity alumina (HPA) is a processed, premium non-metallurgical alumina product characterised by its purity level ie 99.99 per cent (4N) or 99.999 per cent (5N). The market price, application, and

    Sep 1, 2024

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013

  • AUSIMM
    Reducing Crest Loss at Barrick Cowal Gold Mine

    By R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan

    Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre

    Aug 24, 2015

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Applying Modular Transporters to Relocate Large Hydraulic Excavators

    By B Flynn, P Knights

    Low-loaders or 'floats' for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex

    Jan 1, 2009

  • AUSIMM
    An Inversion Method for the Prediction of Peak Particle Velocity in Blasting

    By A T. Spathis, M L. Lawlor-O’Neill

    A methodology for the inversion of a scaled charge weight superposition model to predict peak particle velocity (PPV) has been examined. The inversion involves two steps: first simulated annealing is

    Aug 24, 2015

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    Discovery of the Solomon Iron Deposits

    By D Kepert, C Simpson, D Edwards

    Channel iron deposits (CID) currently supply over 40 per cent of the seaborne iron ore trade out of the Hamersley Province. The two well documented producing systems (Robe and Marillana palaeochannels

    Jan 1, 2009

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    The Effects of Considering the Spatial Bulk Density Variability in Mineral Resources and Reserves

    By J F. C L Costa, J C. Koppe, C Diedrich

    Currently mineral resources evaluation is firstly expressed in terms of volume. Next the resources are transformed into tonnes by using an average bulk density applied to the whole deposit or, in some

    Sep 26, 2011

  • AUSIMM
    The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North

    By R Beaulieu, D Burlingame, C Hanks

    The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development

    Jan 1, 2002

  • AUSIMM
    Chromite and Other Ultramafic Detrital Minerals from the Morobe Coast, New Guinea

    Beach sands on the Morobe coast of New Guinea contain significant amounts of chromite. This chromite, together with the more abundant associated minerals such as olivine, enstatite, tremolite, anti

    Jan 1, 1973

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013