Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide Solution

    By S Lakemond, L I. Ku, J Vaughan

    Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co

    Sep 26, 2013

  • AUSIMM
    Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’

    By A Baker

    Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two

    Nov 8, 2011

  • AUSIMM
    An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modelling

    By J Harding, S Munro, R A. Bearman

    Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin

    Aug 24, 2022

  • AUSIMM
    Designing User Interfaces for the Mines of the Future – User Centred Approach

    By E Widzyk-Capehart

    The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed

    Nov 22, 2011

  • AUSIMM
    Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific Conditions

    By J Pearce, M Barteaux, S Pearce

    The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the

    Jul 27, 2015

  • AUSIMM
    Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz Rejects

    By P V. A van der Westhuyzen

    Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min

    Oct 5, 2011

  • AUSIMM
    A Dynamic Evaluation of Water Supply Security Susceptible to Climate Seasonality

    By G Fergus, M Hart, S W. Weeks

    Rio Tinto Alcan has undertaken feasibility level assessments into the expansion of its bauxite mining operation in an area south of the Embley River in far north Queensland. The project has the potent

    Nov 26, 2013

  • AUSIMM
    Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining Area

    By S Maryati

    Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o

    Nov 22, 2011

  • AUSIMM
    Catalysing lower-carbon mining supply in Australia

    By M Rea, E O’Connell

    Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros

    Sep 1, 2024

  • AUSIMM
    Modification and adsorption of triazine collectors onto pyrite surfaces

    By X Zhang, Y Zhu, P E. Ngoepe, P P. Mkhonto, W Xiong, L Han, L Lu

    The triazine molecules have not been given much attention and they are potential collectors that may positively impact the mineral processing industry. The adsorption of triazine as collectors such as

    Aug 24, 2022

  • AUSIMM
    Crushing Plant Process Optimisation

    Crushing Plant Process Optimisation Design of processes in order to find the most efficient solution to a specific task is a difficult problem. Often the number of solutions are large and the optimal

    Sep 13, 2010

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Pacific Rim Epithermal Au-Ag

    By G Corbett

    Epithermal Au-Ag deposits form in the upper 1 km of the crust and are therefore best preserved in the less eroded Pacific rim arcs, although also recognised elsewhere. Two profoundly different ore flu

    Sep 26, 2013

  • AUSIMM
    Barium Dispersion in Drainage Sediments in Arid Climatic Regimes

    By Bush P. R, Hale M, Dixon C. J, Wheatley M. R

    Barium anomalies in drainage sediments can act as indicators of barite mineralization and path- finders for lead-zinc mineralization. Their detection in an arid climate has been investigated in t

    Jan 1, 1988

  • AUSIMM
    Practical measures of process efficiency and opportunity

    By G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson

    Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid

    Aug 24, 2022

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Blasting related indices as the key to underground blasting improvements in a challenging rock mass

    By J Jackson, E Sellers

    Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto

    Oct 16, 2017