Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fractals and Spatial Geometry - An Application to Veins in the Otago Schist

    Most people are familiar with Euclidean dimensions: zero for a point; one for a line; two for a plane; and three for a volume. Howeverbobjects are not actually Euclidean, but lie somewhere between Euc

    Jan 1, 1992

  • AUSIMM
    Joint Ventures - Taxation Risks and Advantages

    Both here and in Australia, the unique commercial and tax features of joint venture are finding favour in forestry, fishing, technology and infrastructure projects. For New Zealand mining companies, j

    Jan 1, 2005

  • AUSIMM
    Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

    By J Siliézar

    The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a

    Jul 11, 2011

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.

    Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin

    Jan 1, 1978

  • AUSIMM
    Fine grinding circuit process improvement at the Karara mine concentrator

    By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy

    The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag

    Sep 11, 2017

  • AUSIMM
    Zero Liquid Discharge in Coal Mining Operations

    By A Dal-Corobbo, R Zick

    The coal mining industry is now faced with new regulatory requirements that limit the discharge of chlorides into receiving streams. To meet these new regulatory standards for treated mine water, a ze

    Nov 26, 2013

  • AUSIMM
    Listing on Australian Stock Exchange

    Listing on Australian Stock Exchange Limited ('ASX') is a means by which a company can prosper and grow by gaining access to a large capital market. This currently stands at over $300 bil

    Jan 1, 1996

  • AUSIMM
    Is there Gold that We do not Recognise?

    By J S. J van Deventer

    "Conventional wisdom is that gold not assayable is not recoverable or does not exist. There has been no formal study on the possibility that gold assays using advanced spectroscopy such as mass spectr

    Sep 26, 2013

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Ultra-High-Intensity Blasting - A New Paradigm in Mining

    By G F. Brent, S Hawke, M Rothery, P Dare-Bryan

    Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa

    Sep 26, 2013

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • AUSIMM
    Hellyer tailings – complex mineralogy but higher grade than many ore bodies

    By M Barden, G Lane, B Quilliam

    NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing

    Nov 21, 2018

  • AUSIMM
    Renewed Exploration in Canada's Premier Iron Ore District - Labrador West

    By J OÆDriscoll, R Butler, L Winter

    The iron ore mining district of Labrador West and adjacent Quebec is Canada's largest iron ore producer with almost 50 years of production. The area is currently experiencing a period of renewed

    Jan 1, 2009

  • AUSIMM
    Rock Stresses at Ok Tedi, Papua New Guinea

    By L Mollison, K W. Mills, N R. P Baczynski, M F. Lee, I A. de Bruyn

    This is the first of two papers concerned with rock stress inputs to various mine design issues at the large Ok Tedi open pit mine in Papua New Guinea. The companion paper (also published at this conf

    Nov 5, 2014

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Ore Control and Reconciliation to Maximise Metal Delivery ù A Case Study at Ridgeway Gold Mine

    By G Smart, D Ward, J Grace

    Ridgeway Gold Mine is part of Cadia Valley Operations which is wholly owned and managed by Newcrest Mining Limited. It is an underground sublevel cave (SLC) operation mining approximately 5 Mt per ann

    Jan 1, 2003

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Changing Trends in Column Flotation Use – Their Impact for Australian Mill Operators

    By D Frost, G Harbort, T Lipiec, N Deonarain

    "The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them

    Oct 10, 2016

  • AUSIMM
    Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold Mines

    By R C. A Minnitt

    The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima

    Aug 22, 2011