Geomechanics Of Large Stone Structures: A Case History From The Washington National CathedralBy R. Mark, R. Richards
The Washington National Cathedral is one of the largest masonry structures in the USA, and like many of its European Gothic counterparts, it required nearly a century to construct. The design was alt
-
SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future OperationsBy Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius
"The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role
Jan 1, 2007
-
Technology News – Catalyst Helps Cut Diesel Fuel CostsClean Diesels fuel-borne catalyst, Platinum Plus, helps improve fuel economy for all engines up to 10 percent while reducing particulate emissions by up to 25 percent. When used with a simple diese
Jan 1, 2007
-
Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South AfricaBy Hornsey R., P. van der Merwe
The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r
Jan 1, 2003
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
Tailings Dam Failure at Omai in GuyanaBy Steven G. Vick
Effects of the August 1995 failure of the Omai tailings dam in Guyana continue to be felt throughout the mining industry. This article is taken from the final report of the independent body of expert
Jan 1, 1996
-
Design and Construction of the Yarra River CrossingBy R Blair
The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru
Jan 1, 1999
-
Battery Park Truck Sewer Emergency Tunnel ProjectBy Mark Rybak
On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse
Jan 1, 2008
-
Cresson Mine: Case History of a Rapidly Evolving Mining ProjectBy Jeffrey A. Pontius
The Cresson gold deposit is in the southcentral portion of the Cripple Creek mining district in central Colorado (Fig. 1). The deposit is hosted by a series of 32 Ma (Kelley, 1995) felsic to mafic, a
Jan 1, 1996
-
Performance of Dry Separation Processes in Cenospheres Recovery from Coal Fly AshPerformance of Dry Separation Processes in Cenospheres Recovery from Coal Fly Ash
Sep 13, 2010
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)By D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
Prediction Of SiO2-Al2O3-Croxcomplex Inclusions In Steel Containing 16 Per Cent Cr-Si-Al-MnBy P. C. -H. Rhee, H. -G. Lee, J. -H. Choi, D. S. Kim, S. -B. Lee
In order to predict the composition of inclusions and to ascertain a method to prevent inclusions from forming in liquid Fe-16 mass Cr alloy, a thermodynamic database was developed through a quantitat
Jan 1, 2004
-
Processing Strategies for Hidden Valley OperationsBy J Watt
The Hidden Valley Gold Project is located in a remote and mountainous area of the Morobe Province approximately 30 km south of the township of Bulolo and approximately 90 km south-southwest of the pro
Jan 1, 2009
-
RI 9510 - Field Test of an Alternative Longwall Gate Road DesignBy Robert M. Cox
The U. S. Bureau of Mines (USBM) MULSIM/NL modeling technique has been used to analyze anticipated stress distributions for a proposed alternative longwall gate road design for a western Colorado coal
Jan 1, 2010
-
Toward Understanding the Seismic Performance of Rigid InclusionsBy J. Tanner Blackburn, James R. Gingery, Lisheng Shao
Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.
Jan 1, 2018
-
A New Concept for Leak Testing Environmental Enclosure Filtration SystemsBy Michael Schmitz, John A. Organiscak
ABSTRACT: A method (patent pending) has been developed to determine the quality of environmental cab filtration systems. This method utilizes specially configured filter cartridges to remove carbon di
-
RI 4761 Variance In Characteristics Of The Oil In The Weber Sandstone Reservoir, Rangely Field, Colo.By Cecil Q. Cupps
Results are presented of a comprehensive study of the characteristics of the original oil in the Weber sandstone reservoir, Rangely oil field, Colorado. Through the medium of subsurface sampling, adeq
Jan 1, 1951
-
Bulletin 191 Quality of Gasoline Marketed in the United StatesBy E. W. Dean, H. H. Hill
Gasoline has become of such commercial and military importance that it is now practically indispensable. This product is of special interest because, in addition to realizing its value, the Nation is
Jan 1, 1920
-
Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro MatosoBy T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza
The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s
Jan 1, 2004
-
Final Tunnel Liner At The Mill Creek 3 ProjectBy M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008