    Inner City Slurry Tunneling—Project Asdam, Antwerp, Belgium

    By Klaus Rieker

    North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified

    Jan 1, 2007

  • DFI
    Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case History

    By Raffaella Granata

    The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an

    Jan 1, 2006

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    Plastoelastic Analysis Of Bearing Capacity For Soil Anchor

    By Hui Yongning

    This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla

    Jan 1, 1991

  • AIME
    Part VI – June 1968 - Papers - The Superconducting Performance of Diffusion- Processed Nb3Sn(Cb3Sn) Doped with ZrO2 Particles

    By M. G. Benz

    The superconducting performmce of diffusion-processed Nb3Sn is influenced by its micro structure. High isotropic transverse current density may be achieved in this material by a process which forms a

    Jan 1, 1969

  • SAIMM
    Evaluation of floor heaving in galleries by numerical analysis

    By M. Yavuz, M. Aksoy, G. Once, M. Iphar

    This paper is concerned with a study on the floor heaving in the transport road of the GLI Omerler Colliery in Tuncbilek-Turkey. This gallery has been opened at the depth of 200 m through the formatio

    Jan 1, 2003

  • SME
    Industrial Minerals 2004 - Bromine

    By R. Frim, S. D. Ukeles

    The present U.S. production of bromine is from inland brines located in Arkansas and Michigan. The most concentrated domestic brines (up to 5,000 ppm bromide)are situated in Arkansas. Less concentra

    Jan 1, 2005

  • CIM
    A Shaba-type Cu-Co(-Ni) Deposit at Luamata, West of the Kabompo Dome, Northwestern Zambia

    By Nicholas Macrae Steven

    Abstract - The Shaba-type Luamata Cu-Co(-Ni) deposit (11°50_S, 24°28_E) is located in a tectonic slice of Katangan Roan Supergroup (Mines Group) sedimentary rocks, surrounded by younger Kundelungu Sup

    Jan 1, 2000

  • AIME
    Producing–Equipment, Methods and Materials - Rheological Design of Cementing Operations

    By K. A. Slagle

    Hydraulic analysis of the wellbore has become increasingly inzportant for designing cementing operations and selecting equipment, materials and techniques to complenzent modern well-c-ompletion practi

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • SME
    Application Of Propeller Fans At Wisconsin Industrial Sand

    By Albert Adu-Acheampong

    Fairmount Mineral's Maiden Rock underground sand mine historically delivered air to ventilate diesel-powered equipment at its working faces through high-resistance, 381-mm- (15-in.-) diameter PVC

    Jan 1, 2008

  • SAIMM
    Integrated comminution and flotation neurocontrol using evolutionary reinforcement learning

    By A. v. E. Conradie, I. Nieuwoudt

    Comminution and flotation circuits are frequently perturbed by disturbances, such as feed particle size variations, ore hardness and varying mineral liberation, which can have a significant impact on

    Jan 1, 2003

  • SAIMM
    Development Of A CaO-CaF2-Slag System For High Rare Earth Contents

    By B. Friedrich

    In a German governmental funded three-year research project, a closed loop recycling process for Nickel-Metalhydride-Batteries (NiMH) is under development. Today the discarded batteries are used in th

    Jan 1, 2004

  • DFI
    Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation Support

    By Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree

    A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)

    Jan 1, 2018

  • AUSIMM
    Development of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and Throughput

    Development of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and Throughput The emerging discipline of 'geometallurgy' is becoming increasingly recognis

    Sep 13, 2010

  • DFI
    Caltrans Bridge Seismic Design/Retrofit Criteria ? Synopsis

    By Brian Maroney

    In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T

    Jan 1, 1993

  • DFI
    Piled Raft Design For High Rise Buildings In East London, UK

    By D. P. Nicholson

    The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South

    Jan 1, 2002

  • AUSIMM
    Economic Impact Evaluation of Spoil Dump Reshaping Practices (Australia)

    By W C. Burton, J S. Kuszma, T O. Aspinall

    The environmental impact of mining and evolving environmentallegislation has received increased attention worldwide in the last two decades (Bradfield, Shultz and Stone, 1996). The potential impacts a

    Jan 1, 2000

  • SME
    Overcoming Challenges in the Construction of the Dublin Port Tunnel

    By Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan

    The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a

    Jan 1, 2007

  • DFI
    Lateral Pile Load Testing Under Cyclic Loads

    By Dan Brown

    This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed

    Jan 1, 2003