Backfill heat load contribution in deep level mining operationsBy C. A. Rawlins
In an underground mine the ingress of heat can generally be attributed to two sources (Rock exposure and artificial mechanisms). The heat load relating rock exposure is subdivided into stoping [~40%]
Jan 1, 2003
-
EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
-
Benefits of Early Collaboration Between Designers and Suppliers in Tunnel DesignBy Günther M. Volkmann
Continuous developments in tunneling require knowledge transfer between designers and suppliers to optimize the application of support systems. This collaboration allows the designer access to the lat
Jan 1, 2008
-
Applicability of the Hoek-Brown failure criterion and the effect of the anisotropy on intact rock samples from “Athens Schist”By P. Marinos, G. Tsiambaos, H. Saroglou
The anisotropic behaviour of “Athens Schist” has been brought out through the testing of specimens with varying orientation of schistosity with respect to the major principal stress under uniaxial, tr
Jan 1, 2003
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of DesignBy Jimmy Thompson
The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const
Jan 1, 2008
-
Study Of Hammer Selection For Driven Steel Pipe PileBy Jiwei Duan
The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie
Jan 1, 2006
-
Isokinetic Strength - Theory And Description Of Isokinetic Strength MeasurementThe concept of isokinetic measurement of strength was originally related by Hislop and Perrine.(1)Characteristics of an isokinetic exertion are constant velocity throughout a predetermined range of mo
Jan 1, 1998
-
Groundwater Control For Two-Pass Soft Ground TunnelingBy Cary Hirner, David Stacey, William A. Rochford
Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T
Jan 1, 2007
-
Considerations in regard to the safety of RF shot firing equipmentBy C. Cunningham
The process of initiating opencast blasts through long cables is onerous. An obvious alternative is to replace these with radio controlled firing apparatus. Such devices appear from time to time and w
Jan 1, 2003
-
Yet Another Use for ShotcreteBy B Hartmann
In 2003, Independence Group NL purchased the Long Shaft Nickel Mine complex (Long) in Kambalda, Western Australia. Lightning Nickel, the nickel operating arm of Independence Group, faced considerable
Jan 1, 2008
-
eForce..Newest generation of electrostatic separator for the minerals sands industryBy E. Yan
Electrostatic separation has been a mainstay of minerals sands flowsheets for over 50 years. Recent electrostatic developments have shown better conductor/non-conductor separation than technology prev
Jan 1, 2003
-
NATM Design For Stanford Linac Coherent Light Source TunnelsBy Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent
The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with
Jan 1, 2007
-
Coal Desulfurization With Sodium HypochloriteBy Eung Ha Cho, Wendi Li
Wet desulfurization of Pittsburgh No. 8 coal and Illinois No. 6 coal were conducted with sodium hypochlorite in the laboratory. Pittsburgh No. 8 coal was leached by hypochlorite at high pHs in one ste
Jan 1, 2005
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Gas-Phase Fluorination Kinetics Of Ta2O5 With Elemental Fluorine - SynopsisBy A. D. Pienaar
The aqueous chemistry of niobium and tantalum compounds with hydrofluoric acid is a mature field of investigation. In contrast, very little attention has been paid to reactions of these compounds in n
Jan 1, 2012
-
Planning and Design of the A3 Hindhead Tunnel, Surrey, United KingdomBy Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
-
SMR Geomechanics classification: Application, experience and validationBy R. Romano, E. Montalar, J. B. Serón
The SMR geomechanics classification system (adaptation of RMR for slopes) is reviewed with data from 87 actual slopes in Valencia. In a research project, SMR has been applied by a GIS system, as a met
Jan 1, 2003
-
Investigation Of Residual Stresses Superposition Of D2 Dies Due To Heat Treatment And Multipass GrindingBy Olga Karabelchtchikova
Keywords: Multipass grinding, Residual stress, Retained austenite, X-ray diffraction The study investigated residual stresses behaviors and their superposition effect in D2 dies for thread-rolling
Jan 1, 2005
-
A review of information on the influence of plan curvature on rock slope stability and its effect on the volume of wedge failuresBy R. Armstrong
The stability of rock slopes is significantly influenced by their curvature in plan view. The importance of this in open pit mining is indicated by the fact that, in a deep pit, steepening of the slop
Jan 1, 2003