Search Documents

Sort by

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • SAIMM
    The determination of stable inter-pillar spans at Tau Lekoa Mine

    Ground control problems in the form of large dome or wedge collapses have been experienced at Tau Lekoa Mine since production began. Crush pillars in various configurations have been used and through

    Jan 1, 2003

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.

    Jan 1, 2007

  • SAIMM
    Development of a simulation program to predict gas emission based on 3D stress analysis

    By S. Matsuyama, S. Tomita, H. Kawahara, G. Deguchi

    A proper management system of coal mine methane gas associated with underground mining activities is essential for the mine safety due to its nature of explosion. Optimum design of the mine ventilatio

    Jan 1, 2003

  • SAIMM
    SA coal resources and reserves, a present-day outlook

    By X. M. Prévost

    The reassessment of coal reserves has become a matter of urgency and has come as a result of the present situation of the industry, in the context of globalized coal economies, as well as new mining l

    Jan 1, 2003

  • DFI
    Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral Loading

    By Padmavathi V. Sagi

    In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin

    Jan 1, 2006

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • SME
    Raw Water Tunnel Condition Assessment

    By Rafael C. Castro

    As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In

    Jan 1, 2008

  • SME
    Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical Approach

    By John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott

    A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and

    Jan 1, 2007

  • AUSIMM
    Effects of Hydrated Mg2+ on KCl Flotation

    Effects of Hydrated Mg2+ on KCl Flotation

    Sep 13, 2010

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • SME
    The Big Walnut—A Planned Approach

    By Tom Szaraz, Steve Skelhorn

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through

    Jan 1, 2007

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • SAIMM
    Sensibility analysis of the thermo-hydro-mechanical behaviour of a radioactive waste storage shaft in a deep shale using probabilistic methods

    By S. Escoffier, A. Giraud, K. Su, F. Homand, N. Hoteit

    Abstract For the feasibility study of an underground waste disposal the characterization of the coupled behaviour of the host rock is required: Because of the very low permeability of these formations

    Jan 1, 2003

  • SME
    New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures

    By George Watson, Gu Quanzhong, S. Gerard Sawyer

    Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be

    Jan 1, 2005

  • SME
    Large-Diameter Tunneling Collapses: Recovery Design and Execution

    By Bradford F. Townsend

    A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed

    Jan 1, 2008

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • SME
    Underground Construction Photography: Documenting a Success Story

    By Susan L. Bednarz

    Recent advances in digital cameras and image processing allow photographers to produce excellent high-resolution action shots in low light and high contrast conditions commonly encountered underground

    Jan 1, 2008

  • SAIMM
    Considering in situ grade variability during mining sequence

    By R. Peroni, J. Kopp

    Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati

    Jan 1, 2003

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006