Search Documents

Sort by

  • AIME
    Secondary Recovery and Pressure Maintenance - Conduction-Convection in Underground Combustion

    By B. K. Larkin, H. R. Bailey

    A model Of heat flow in an underground combustion process is studied. This model includes convection effects and thus is more general than previous studies which considered conduction as the only mech

  • AIME
    Index (Transactions and other A.I.M.E. Publications for 1930)

    [Separates of all the Technical Publications published in 1930 are available at Institute headquarters. All the papers are on file in public, university and technical libraries, and when so indicated

    Jan 1, 1930

  • CIM
    A Canadian program in mining automation

    By A. Piche, J. Nantel

    "This paper describes the recent developments in Canada toward the establishment of a Canadian Centre for Mining Automation and Robotics, at McGill University and École Polytechnique in Montreal. The

    Jan 1, 1988

  • AIME
    Colorado Paper - Magnetic Observations in Geological Mapping

    By Henry Lloyd Smyth

    In 1891-92 1 was entrusted with the geological survey of part of the large area lying between the Marquette and Menominee iron-ranges in the Upper Peninsula of Michigan, and extending from the Republi

    Jan 1, 1897

  • AIME
    X-Ray Studies Of Coal And Coke

    By Ancel St. John

    DURING a session on coal and coke at the February, 1926, meeting of the American Institute of Mining and Metallurgical Engineers, the writer called attention to the important work on the X-ray analysi

    Jan 10, 1926

  • AIME
    Technical Papers and Notes - Institute of Metals Division - Tensile Strength of Sintered Iron Powder as a Function of Surface Area and Particle Shape

    By S. B. Twiss, P. R. Basford

    The relationship between areas of iron powders, briquettes, and sintered compacts and tensile strength has been determined. It has been found necessary to distinguish between two types of areas which

    Jan 1, 1959

  • AIME
    Part VIII - Papers - Thermodynamics of Ferritic Solutions of the Iron-Zinc System at 700° to 900°C

    By H. A. Wriedt

    Zinc-vapor pressures in equilibrium with bcc solutions of zinc and iron at 703.5", 757", 793", and 900°C were measured by an isopiestic method. Thermody-na?nic properties of zinc in these solutions we

    Jan 1, 1968

  • AIME
  • AIME
    Reservoir Engineering - General - Steady-State Flow Capacity of Wells With Limited Entry to Flow

    By A. S. Odeh

    This paper analyzes the effect of limited entry to flow at the wellbore on the steady-state productivity of a well. Wells that have been opened to flow along a fraction of their productive interval ar

    Jan 1, 1969

  • CIM
    On the feasibility of mining peat for power generation in Canada

    By A. Ismail

    "The paper takes its material from three peat mining and power project feasibility studies sponsored by CANMET and conducted by Montreal Engineering Company Ltd. in the years 1976 to 1980. The role wh

    Jan 1, 1980

  • AIME
    Rock Mechanics - Method of Determining In-Situ Stress in Anisotropic Rock

    By Verne E. Hooker, Robert M. Becker

    The evaluation of in-situ rock stresses from measurements of the change in diameter of a borehole that is stress-relieved by overcoring has become a common practice. Generally the stress evaluation ha

    Jan 1, 1970

  • AUSIMM
    Chinese Non-Ferrous Metals

    DURING the four years, 1922, 1923, 1924, and 1925, China produced the following quantities of non-ferrous metals and ores: Antimony Products - 67,869 (long) tons. The production for 1925 was 20,869 to

    Jan 1, 1927

  • AUSIMM
    Current Trends in Countercurrent Decantation and Thickener Circuit Operability and Control

    By E Broers, J Goh, S Davies

    With recovery being important in optimising the business performance of a laterite and sulfide plant and with water being a precious resource in Australia, there has been increased pressure for compan

    Jan 1, 2009

  • AIME
    Aerial Reconnaissance and Contour Mapping in Mining

    By Leon Eliel

    TEN years ago a broad knowledge of aerial mapping, coupled with a smattering of geology, qualified one to speak on the subject of the appli-cation of aerial mapping to geology. Today, with aerial maps

    Jan 1, 1936

  • NIOSH
    Carbon in Diesel Particulate Matter: Structure, Microwave Absorption and Oxidation

    By M. S. Seehra, V. S. Babu, L. Farinash

    "The diesel particulate matter (DPM), a constituent of the diesel engine exhausts, is known to be a potential carcinogen. 1- 3 Consequently, suitable methods to control/eliminate DPM have ·been under

    Dec 1, 1996

  • SME
    Tectonic Model For Kimberlite Exploration In The Appalachians

    By Jay Parrish

    Appalachian kimberlites appear to be spatially distributed along two structure parallel trends running from Tennessee to New York. It is hypothesized that the kimberlites were emplaced at the intersec

    Jan 1, 1984

  • ISEE
    Shock Physics Analysis of Air-Deck Behavior during Rock Blasting

    By Ruilin Yang

    This paper provides a theoretical analysis of shockwaves in an air-deck induced by detonation of an explosive charge and shows that the initial shock pressure in the air-deck at the interface with the

    Jan 1, 2016

  • CIM
    Scaling Analysis Via Geometric and Performance Data for Shovel Dipper Design

    By N. Shi, T. G. Joseph

    ABSTRACT One-twentieth-scale field trials for conventional and concept dipper designs were compared to mid- and ultra-class-sized conventional dipper performance. Digging effort was used as the perfor

    Jan 1, 2011

  • DFI
    Tresfjord Bridge -Pile Works

    By Andreas Andenæs, Arne Schram Simonsen

    "AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises

    Jan 1, 2014

  • SME
    Construction And Operation Of An Innovative Long Distance Conveying System At Twin Buttes

    By F. Brost

    In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower Partnership Mine to Twin Buttes. The system, supplied and installed by Cable Bel

    Jan 1, 1979