Search Documents

Sort by

  • NIOSH
    OFR-172-83 Theoretical Study, Design And Analysis Of An Improved Shuttle Car Cable Reel

    By PW Meisel

    An hydraulic-powered reel system to minimize peak tension transients in shuttle car trailing cables has been theoretically designed and analyzed using a computer. A single spring-loaded take-up sheave

    Jan 1, 1983

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • SAIMM
    A Real Options Application To Manage Risk Related To Intrinsic Variables Of A Mine Plan: A Case Study On Chuquicamata Underground Mine Project

    By J. Botin

    Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance

    Jul 1, 2013

  • SME
    Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology

    By Ulf G. Gwildis

    The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G

  • AUSIMM
    Some Effects of Wood, Cement, and Aluminium Sulphate on Flotation of Broken Hill Lead-Zinc Ore

    Results of flotation tests on lead-zinc ore from Broken Hill, N.S.W., confirmed that flotation at pH 9 in the presence of cement gave poorer metallurgical results than flotation at pH 7. Additions of

    Jan 1, 1974

  • NIOSH
    Water Jet Perforation Of Well Casings - Objective

    Reduce the cost of modifying uranium well casings so that leaching solutions can pass through, but sand grains are blocked. Approach The well casing and surrounding cement are perforated at th

    Jan 1, 1978

  • SAIMM
    Sampling In The South African Minerals Industry

    Although not fully accepted in South Africa, the Theory of Sampling originally proposed by Pierre Gy is fast becoming the cornerstone of sampling practice throughout the world. The growing acceptance

    Jan 1, 2014

  • NIOSH
    Air Curtain Provides Dust Protection - Objective:

    To reduce the exposure of mining machine operators to respirable dust. Approach: A protective curtain of filtered air is blown down around the operator's head, from a manifold mounted on

    Jan 1, 1976

  • CIM
    Towards Sustainable Mining

    ?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can

    May 1, 2011

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • CIM
    Ready or Not?Here They Come

    By Stephen Hammond

    ?Our own prejudices form the greatest barrier to creating an inclusive working environment.? Have you witnessed? Racism or Negative Comments about an Aboriginal Person? ?You are free to compete wi

    May 1, 2008

  • NIOSH
    In Situ Measurement Of Rock Stress With Hydraulic Borehole Pressure Cells ? Objective

    Develop a new technique of in situ rock stress measurement which can be used when and where the conventional methods, such as the overcoring stress relief methods and the hydrofracturing method, canno

    Jan 1, 1988

  • AUSIMM
    The Reduction of Nickeliferous Laterites: Thermodynamic Considerations

    By Turnbull A. G

    Thermodynamic calculations based on the ideal system NiO - Fe203 - H2(g) - CO(g) - H2O(g) - CO2(g) show that it is not possible to selectively reduce nickel oxide in the presence of hematite because f

    Jan 1, 1980

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • SAIMM
    Comminution Research At The University Of Cape Town

    Comminution is a vital part of minerals extraction, and therefore of the South African economy. The high cost and throughput-limiting nature of comminution forms a strong motivation for research direc

    Jan 1, 1998

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • SAIMM
    2.3 Barnard - From Dust To Dust??

    By P. Rice, A. Photolo, A. C. Barnard

    Introduction -Sampling Tool Project (STP) -History -Results to date -Costs -Questions

    Jan 1, 2005

  • SME
    Minerals Education Through The National Science Teachers Association Meetings: The Past And The Future

    By J. N. Murphy

    The use of the National Science Teachers Association (NSTA) regional meetings as a forum to educate teachers on the role of minerals in our society has been immeasurably successful. Each year, on ave

    Jan 1, 2001

  • SME
    Relationship Between Bond Work Index And Textures And Cooling Method Of Granulated And Cooled Ferronickel Refining Slags

    By D. Richter

    The Pyrometallurgical refining stage of ferronickel manufacturing produces a slag rich in iron and nickel, which is usually further processed for metal recovery. The recovered material is returned to

    Jan 1, 2011