Ore Ageing Test Work for the Ok Tedi SkarnsBy M Morey
Ok Tedi Mine is located eighteen kilometers from the Irian Jaya border in the Star Mountains, Western Province, Papua New Guinea. Sequential flotation concentrators produce a copper / gold concentrate
Aug 8, 2011
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
Crushers – An Essential Part of Energy Efficient Comminution CircuitsBy R Bearman
The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha
Aug 8, 2011
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
Optimising Western Australia Magnetite Circuit DesignBy D David
The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po
Aug 8, 2011
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective ProcessesBy M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
Non-Contact Acoustic Measurement of Dynamic In-Mill Processes for SAG/AG MillsBy R A. Pax
Heavy machinery such as AG and SAG mills generate a significant amount of noise due to the processes that are occurring inside them. From an environmental perspective, the level of noise generated is
Aug 8, 2011
-
Recent Improvements to the Gravity Gold Circuit at Marvel LochBy A Bird
Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme
Aug 8, 2011
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
In-Pit Tailings – World’s Best Practice for Long-Term Management of TailingsBy G M. Mudd
Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili
Aug 8, 2011
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
IsaMill™ Design Improvements and Operational Performance at Anglo PlatinumBy C Rule
In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan
Aug 8, 2011
-
Engineering and Science in Flotation Cell DesignBy J Euston
In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi
Aug 8, 2011
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas MineBy A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Increasing Capacity and Efficiency of Grinding Circuits with High Frequency ScreensBy J Wheeler
The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an
Aug 8, 2011
-
Predicting Variations in Mill FeedBy P McCarthy
The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction
Aug 8, 2011
-
Filtration Test Work – Extracting the Whole Story for Studies and DesignBy G Bickert
Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a
Aug 8, 2011
-
The Importance of Evaluating Grinding PerformanceBy R L. Koenig
Previous papers at Metplant conferences have covered the options for crushing and grinding circuit selection. High Pressure Grinding Rolls (HPGR) may have considerable advantages over autogenous mill
Aug 8, 2011