Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of Grade Control Sampling Programs for Underground Gold MinesBy S C. Dominy
Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s
Aug 22, 2011
-
Fundamental Sampling Error and Sampling Precision in Resource Estimation – A DiscussionBy N Schofield
For the sampling of particulate materials in mineral exploration and mining, the fundamental sampling error (FSE) introduced by Gy is a measure of the constitutional heterogeneity of the sample lot an
Aug 22, 2011
-
Discovery to Production – The Athena Gold MineBy D Howe
The Athena gold deposit was discovered in 2007 by Gold Fields Australia Ltd, at the St Ives Gold Mine, 35 km southeast of Kambalda, Western Australia. Gold anomalism was identified in sheared Paringa
Aug 22, 2011
-
Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South AfricaBy G Kirk
Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s
Aug 22, 2011
-
Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, AustraliaBy A Fowler
The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit
Aug 22, 2011
-
Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western TanzaniaBy M J. Nugus
The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF
Aug 22, 2011
-
The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case StudyBy A J. Daniels
Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p
Aug 22, 2011
-
Raising Sangdong – A Staged Approach to the Redevelopment of an Old OperationBy C Lutherborrow
The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in
Aug 22, 2011
-
Role of Environmental Ore Deposit Models in Resources DevelopmentBy Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
The Merlin Molybdenum Rhenium Deposit, Mt Isa Inlier – Two Years from Discovery to DevelopmentBy G Phillips
The Merlin project is situated 130 km south of Cloncurry in North West Queensland, Australia. It is located within the Pre-Cambrian Mt Isa Inlier and is grouped within the Eastern Fold Belt. The host
Aug 22, 2011
-
Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?By E J. Cowan
Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore
Aug 22, 2011
-
The Influence of Geology on Blasting Hazards and ResultsBy T N. Little
The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini
Aug 22, 2011
-
Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold MinesBy R C. A Minnitt
The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima
Aug 22, 2011
-
Carbon Prefloat Improvements at Century MineBy D G. Rantucci
Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions
Aug 8, 2011
-
Professional Development for Metallurgists – Improving Technical SkillsBy D Drinkwater
In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was
Aug 8, 2011
-
The Integration of Geometallurgy with Plant DesignBy G Harbort
Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat
Aug 8, 2011
-
Sensible Cost Cutting for Resource ProjectsBy D Connelly
As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c
Aug 8, 2011
-
‘We’re Metallurgists, not Magicians!’By E McLean
The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its
Aug 8, 2011
-
Flotation Mechanism Design for Improved Metallurgical and Energy PerformanceBy R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011