Search Documents

Sort by

  • CIM
    Design of an Optimal Lining Material to Prevent Coal Fires at Underground Coal Mines

    By A. H. Onur

    Spontaneous combustion of coal is a significant hazard in underground coal mines. It causes serious problems for miners for many years after the fact. It threatens workers? lives and causes economic l

    Aug 1, 2013

  • CIM
    Laboratory Study on Rockbolt Corrosion

    The effect of long term exposure of full size bolts to corrosive environments is presented. A special test rig was used to test four bolts under different loading conditions. Four, X-grade identical p

    Aug 1, 2013

  • CIM
    Bio-Liquefaction of Fushun Coal and its Model Compounds by White Rot Fungi Hypocrea Lixii Ah

    By Xiu-Xiang Tao

    This study investigated bio-liquefaction of lignite and its model compounds of thymol, bezioc acid and quinoline by a fungus, Hypocrea lixii AH. It analyzed, during bio-liquefaction, enzyme activity o

    Aug 1, 2013

  • CIM
    Utilization of Methane Released During Coal Mining Activities

    By M. Uszko

    Methane drainage and ventilation methods of methane hazard mitigation are used in the coal mines of Kompania Weglowa S.A. Over 22% of methane released during mining activities is captured by methane d

    Aug 1, 2013

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    In Pit Crushing & Conveying in hard rock applications Todays? challenges ? future?s chances

    By Andreas Oberrauner

    Content ? What is? an introduction ? Crushing technology ? Conveying in pits ? Pit-exiting strategies ? Mine Planning in IPCC ? Summary/Conclusions EHS slide ? Sandvik?s objective is zero harm

    Aug 1, 2013

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Research on the Comparison of Operator Viewpoints Between Manned and Remote Control Operation in Unmanned Construction Systems

    By Akihiko Nishiyama

    Unmanned construction technology used for remote control operation of construction machines has some problems to solve compared with manned operation of construction machines, such as fatigue due to l

    Aug 1, 2013

  • CIM
    Research on Bionic Unit Diameter and Arrangement Affecting the Performance of Bionic Drill Bits

    By Chuan-liu Wang

    The bionic non-smooth surface has the characteristics of anti-wear, and reducing resistance. Based on bionic non-smooth surface?s characteristics, a bionic drill bit was developed. When the bionic dri

    Aug 1, 2013

  • CIM
    Research into a New Method to Define the ?Three Zones? Above a Thick Coal Seam Mines Byfull-Height Extraction

    By Zhiqiang Wang

    This paper mainly focuses on the method of ?three-zone? definition (a caving zone, a fissure zone and a curve subsidence zone) for full height cutting in a thick seam. Based on criteria of a caving zo

    Aug 1, 2013

  • CIM
    SmartEXEC Implementation Goldcorp Eleonore Project

    By Michel Massé

    Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O

    Aug 1, 2013

  • CIM
    The Application Of IPCC at the Moatize Coal Project

    By R. J. McCarthy

    In-pit Crushing and Conveying (IPCC) is increasingly being considered by mining companies as a means to reduce their dependence on trucks and thus, fuel, tires, labour, etc. There is potential for gre

    Aug 1, 2013

  • CIM
    Strength, Deformation and Thermal Parameters of Rocks Heated to High Temperatures

    By Piotr Malkowski

    Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi

    Aug 1, 2013

  • CIM
    Framework for Estimating Cost of Infrastructure Adaptation to Climate Change

    By H. Lee

    Recently, the effects of global climate changes have become top concerns for governments? decision making regarding infrastructure investments. Extreme weather events that exceed the capacity of exist

    Aug 1, 2013

  • CIM
    Numerical Modeling of Brittle Rock Failure Under Dynamic Stress Loading

    By N. Golchinfar

    Tunnels in deep mines are subjected to high stresses. Fracture and failure of the rock mass around an opening can occur when mining-induced stresses are high. In burst-prone grounds, mining-induced se

    Aug 1, 2013

  • CIM
    Autonomous Robotic Dozing for Rapid Material Removal

    By Gary M. Bone

    The autonomous control of vehicles interacting forcibly with their environment, such as dozers and tractors, is an unsolved and challenging problem. Forces and motions are inherently coupled between t

    Aug 1, 2013

  • CIM
    Recent Solutions to Evaluate the Required Strength of Cemented Backfill

    By L. Li

    Backfill is increasingly used in underground mines, as it can help reduce the environmental impact from mining operations. However, the primary objective of backfilling is to provide safe working spac

    Aug 1, 2013

  • CIM
    Analyzing Building Information Using Graph Theory

    By S. Isaac

    The networks of interdependencies between elements in building projects, referred to as the project topology, are often complex and difficult for project teams to comprehend. It is hypothesized that a

    Aug 1, 2013

  • CIM
    Leveraging Bim for Automated Fault Detection in Operational Buildings

    By A. Golabchi

    Building Information Modeling (BIM) is an increasingly popular method for generating and managing facility information during the life cycle of a building, ranging from facility conceptualization, thr

    Aug 1, 2013