An initial review of conceptual alternative layouts for production areas in Kiirunavaara mineBy F K. Altuntov
The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b
Mar 29, 2023
-
Construction and monitoring of development access into highly stressed rock massesBy R Talebi
A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S
Mar 29, 2023
-
Project and execution of the excavation for a haulage shaft with raise boring techniquesBy M Orunesu Preiata
The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo
Mar 29, 2023
-
Planning for underground mining at Savage River Iron Ore MineBy U Singh
This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) pla
Mar 29, 2023
-
Thin spray liners for face support at KanmantooBy B Roache
Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers
Mar 29, 2023
-
Chamfered backs to improve open stope stability in poor ground conditionsBy G Capes
A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann
Mar 29, 2023
-
Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technologyBy P Jere
Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons
Mar 29, 2023
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
A global review of productivity and operational performance in sublevel caving minesBy A D. Campbell
The sublevel caving (SLC) mining method is becoming more widely adopted as an underground mining method as mines become deeper and target lower grade mineralisation. SLC has been successfully adopted
Mar 29, 2023
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Friction rock stabiliser QAQC and a process to investigate high pull test failure ratesBy R Varden
Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust
Mar 29, 2023
-
Intersection reinforcement with self-drilling anchors for improved productivity at KanmantooBy J Jardine
An improved ground support method for development intersections, wide spans and stope brows was implemented at Kanmantoo mine. The method uses a jumbo to simultaneously drill and install self-drilling
Mar 29, 2023
-
Reverse stoping using wireless initiation at CSA MineBy B Small
CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca
Mar 29, 2023
-
Near field blast vibration monitoring for slot or winze blast analysisBy E Wargem
The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is
Mar 29, 2023
-
The successful deployment of a fatal risk system, designed for the front-lineBy C J. Pitzer
The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine
Mar 29, 2023
-
Design of raise caving operations in LKAB minesBy T Ladinig
Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st
Mar 29, 2023
-
The future is electrifying – introduction of a battery electric loader to CSA MineBy M Ireland
Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate
Mar 29, 2023
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
No entry mechanised presink of the Wira Hoisting ShafBy D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
E26 Lift 1 North block cave development and constructionBy R Cunningham
The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared
Mar 29, 2023