Search Documents

Sort by

  • SME
    Ground rippability classification by decision trees - SME Transactions 2015

    By E. Siami-Irdemoosa, S. R. Dindarloo

    Ease of excavation or rippability, also called diggability or excavatibility, is a critical decision-making parameter in the selection of both the overburden removal method and the required equipment

    Jan 1, 2015

  • SME
    A preliminary evaluation of potential perfluoromethylcyclohexane release vessel designs for tracer gas studies in underground mines - SME Transactions 2015

    By K. D. Luxbacher, E. C. Jong

    Perfluoromethylcyclohexane (PMCH), a member of the perfluorocarbon tracer group of compounds, has been shown to be a viable supplement to the widely used tracer gas sulfur hexafluoride (SF6). This via

    Jan 1, 2015

  • SME
    Development of a model to determine oxygen consumption when crawling - SME Transactions 2015

    By P. G. Dempsey, J. R. Heberger, J. P. Pollard

    During a mine disaster or emergency, underground air can quickly become contaminated. In these circumstances, all underground mine workers are taught to don breathable air supply units at the first si

    Jan 1, 2015

  • SME
    Stress corrosion cracking – hypothetically a major threat to underground mine roof support systems and rock anchors - SME Transactions 2015

    By G. Bylapudi, A. Bhagwat, K. Mondal, A. J. S. (Sam) Spearing

    Minimizing the effects of corrosion improves the long-term performance of the rock anchors and ground control systems in underground mines, which is fundamental for safe operation over the design peri

    Jan 1, 2015

  • SME
    CFD analysis on gas distribution for different scrubber redirection configurations in sump cut - SME Transactions 2015

    By L. Zhou, J. P. Rider, T. W. Beck, J. A. Organiscak, Y. Zheng

    The National Institute for Occupational Safety and Health’s Office of Mine Safety and Health Research recently developed a series of models using computational fluid dynamics (CFD) to study the gas di

    Jan 1, 2015

  • SME
    A design tool for improving the safety of highwall mining operations - SME Transactions 2015

    By Y. Luo

    Highwall mining, which is a relatively new mining method, is a preferred and often the only feasible method for extracting coal reserve left by surface mining operations in areas with steep terrain an

    Jan 1, 2015

  • SME
    NAT 2014 Full Proceedings - NAT2014

    By Gregg Davidson, Lonnie Jacobs, Brett Zernich, Alan Howard, Robert Pintabona

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2014

  • AUSIMM
    Application of the Theory of Constraints to Strategic and Tactical Mine Planning

    By T Elkington, A Finch

    The theory of constraints (TOC) is a business improvement method that focuses on exploiting a business’s bottleneck to deliver the highest possible profit. Early applications were mostly in the manufa

    Nov 24, 2014

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014

  • AUSIMM
    Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands

    By T Wambeke, J Benndorf

    A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att

    Nov 24, 2014

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Not for the Faint-Hearted

    By J Whittle

    This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the

    Nov 24, 2014

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty

    By R Dimitrakopoulos, R Goodfellow

    One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a

    Nov 24, 2014

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Joint Simulation of Correlated Variables Using High-order Spatial Statistics for Orebody Modelling

    By R Dimitrakopoulos, I Minniakhmetov

    Geostatistical simulation techniques are used to quantify uncertainty of spatial attributes of interest describing mineral deposits, petroleum reservoirs, hydrogeological horizons, environmental conta

    Nov 24, 2014

  • AUSIMM
    Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits

    By A Melkumyan, K Silversides

    The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.

    Nov 24, 2014