Search Documents

Sort by

  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    Balancing the benefits and impacts of future copper demand – climate change and arsenic

    By P J. Bangerter, G D. Corder

    With the societal desire and drive towards low carbon energy sources, there is a growing awareness of the important role that minerals and metals will play with renewable energy technologies. Copper

    Jul 25, 2018

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018

  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution models

    By D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi

    Jul 25, 2018

  • AUSIMM
    The impact of rip lines on erosion at the Ranger Mine Site

    By M J. Saynor, J B. C Lowry

    The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19

    Jul 25, 2018

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Five years of cover performance monitoring and modelling for a store and release cover at Century Mine

    By T Rohde, P Defferrard

    In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo

    Jul 23, 2018

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    Geotechnical behaviour of spent ore – impacts of metallurgical factors

    By R Rimmelin, C Vergara

    Heap leach pads are composed of mined ore, usually crushed, disposed on liners to be processed with leach solutions, and the tail of the process is called “spent ore” which are then transported by con

    Jul 23, 2018

  • AUSIMM
    Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailings

    By D J. Williams, S Islam

    Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad

    Jul 23, 2018

  • AUSIMM
    A waste fines cell with a multitude of concurrent activities

    By J J. Boshoff

    This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the

    Jul 23, 2018

  • AUSIMM
    Instrumented column testing of salt uptake from compacted red mud into a cover

    By Y Zhu, D J. Williams, M O’Neill, C Zhang, X Lei

    A cover of inert material overlain by topsoil is required over compacted, seawater-neutralised red mud, a waste product from the refining of bauxite to produce alumina. The cover is to be revegetated,

    Jul 23, 2018

  • AUSIMM
    Consolidation and shear strength of coal tailings slurries

    By D J. Williams, S Islam

    Worldwide production of black coal amounts to about 8 billion tonnes. Perhaps 20% of this annual production is washed to improve its quality, generating perhaps 250 million tonnes of coal tailings ann

    Jul 23, 2018

  • AUSIMM
    Predicting changes in static liquefaction susceptibility using cone penetration test results

    By J T. Sharp, M A. Styler, D McGowan, P W. Mayne

    Static liquefaction is a geotechnical hazard in mine tailings facilities. Soils that are contractive in shear are susceptible to static liquefaction. Tailings facilities are dynamic structures, typi

    Jul 23, 2018

  • AUSIMM
    The development of soil water characteristic curves for soil types classified according to the USCS

    By A Satyanaga, H Rahardjo, K G. Mercer

    The soil-water characteristic curve (SWCC) is one of the most essential soil properties in unsaturated soil mechanics. The water flow and storage characteristics of an unsaturated soil are closely rel

    Jul 23, 2018

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018