Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
The Use of Structural Codes in Tunneling - RETC2021By Harry Asche
Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn
Jun 13, 2021
-
Tunneling Beneath Downtown Bellevue on Time and Under Budget - RETC2021By Ted DePooter, Mun Wei Leong, Chad Frederick
Downtown Bellevue Tunnel (DBT) is part of Sound Transit’s $3.7 billion, 14-mile light rail transit system from downtown Seattle, across Lake Washington, to the cities of Mercer Island, Bellevue, and R
Jun 13, 2021
-
Remote Vein Miner—Uncovering an Opportunity for Tunneling Projects - RETC2021By Jamal Rostami, Mark Board, Clayr Alexander, Muthu Vinayak Thyagarajan
In the past several decades, many major equipment manufacturers have ventured into developing new technology for underground hard rock excavation. This includes variety of configurations for full and
Jun 13, 2021
-
Mechanism of Advancing Drift on Weak Ground Excavation - RETC2021By Sadatoshi Ohmori, Karen Shinoda, Nobuharu Isago
Method of tunnel excavation is generally classified such as full-face excavation, bench-cut excavation, diaphragm with center pillar excavation, center drift advancing excavation and so on. These exca
Jun 13, 2021
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021By Michael Schultz, Gregory Sanders
The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ
Jun 13, 2021
-
Application of Surrogate Modeling for SEM Tunneling SimulationBy Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney
This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri
Jun 13, 2021
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021By Arash Dahi Taleghani, Pooyan Asadollahi
Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr
Jun 13, 2021
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad CorridorBy Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau
Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r
Jun 13, 2021
-
Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021By Todd Clarke, Ralf Winterberg
For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv
Jun 13, 2021
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
Verification and Update on High Pressure Concrete Plug Leakage Remediation - RETC2021By Seung Han Kim, Andrew Yu, Carlos Jaramillo, Chu-Chieh Jay Lin
The Penstock Access Tunnel (PAT) concrete plug is a reinforced concrete plug separating the pressure tunnels from the personnel accessible tunnels and has leaked since the first filling at the Helms P
Jun 13, 2021
-
Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021By Mirko Martini, Marcelo Benaglia, Andrea Codalli
Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its
Jun 13, 2021