Search Documents

Sort by

  • AUSIMM
    Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional Area

    By A Bagis

    Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while

    Mar 8, 2011

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011

  • AUSIMM
    An Investigation into the Effectiveness of Under Platform Exhaust Systems Based on Measurements from the Copenhagen Metro

    By S Ravn

    Under platform exhaust (UPE) systems are often designed into metro stations as a means of removing heat generated by trains as they come to a halt in the platform. These systems are designed to extrac

    Mar 8, 2011

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Investigation of Shield Face Stability by Transparent Soil Models

    By M Ahmed

    Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u

    Mar 8, 2011

  • AUSIMM
    Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement

    By R Winterberg

    Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special

    Mar 8, 2011

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011