Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Appendix C – Production Of Coal In 1863, 1864, 1865During the latter part of the Civil War an income tax was placed upon coal and the production of coal in the various collection districts during the life of this tax is shown in the tabulation that fo
Jan 1, 1942
-
Appendix D - Definitions Of Program VariablesBy C. B. Manula, R. L. Sanford, R. A. Rivell
A - Contains the coordinate pair information for deriving the co¬efficients of the 3rd degree polynomial which approximates the loading station equation. C(N) - Coefficients for third degree approx
Jan 1, 1974
-
Appendix D - Development And Experimental Verification Of Acoustic Seal Checker TheoryBy David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX D DEVELOPMENT AND EXPERIMENTAL VERIFICATION OF ACOUSTIC SEAL CHECKER THEORY 1. Introduction In Section 7 of the report the acoustic seal checker concept was described in a general m
Jan 1, 1973
-
Appendix D - Methods For Controlling Respirable Coal Mine Dust From Overburden Drilling At Surface Coal Mines - D.l Engineering ControlsEngineering controls for overburden drilling include dry dust collection systems, wet dust suppression systems, and enclosed cabs [Zimmer and Lueck 1986; Volkwein et al. 1979]. Proper maintenance of t
Jan 1, 1997
-
Appendix D - Use of an Interactive Computer System for Ground Water ModelingBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
INTRODUCTION The majority of ground water flow models have been developed for large computer systems. Most of these operate under a batch mode of operation, that is, the data are input with a deck o
Jan 1, 1986
-
Appendix E - Equipment Used For Field Testing Of Mine Sealing SystemBy David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX E EQUIPMENT USED FOR FIELD TESTING OF MINE SEALING SYSTEM I. Drilling Operation - Equipment supplied by local drilling contractor 1. Mobile drill rig. 2. Flat bed truck, containing 2
Jan 1, 1973
-
Appendix E - Refuge Chamber Leakage AnalysisBy David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX E REFUGE CHAMBER LEAKAGE ANALYSIS Variables p 0 = pressure outside of chamber (psi) p = pressure inside of chamber (psi) i q = leakage flow rate (cfm) Q= total leakage (cu ft. ) V
Jan 1, 1976
-
Appendix E - Unsaturated FlowBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
The term unsaturated flow refers to the conditions in which soil pores are filled partially with water and partially with air. This situation constitutes a porous material filled with immiscible fluid
Jan 1, 1986
-
-
Appendix F - Simulation Summaries of the Uranium and Lead MinesBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Jan 1, 1986
-
Appendix H – Computer Output for Initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix I - Cost Analysis SystemBy R. V. Ramani, V. T. Burgos, J. A. McClay
Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl
Jan 1, 1975
-
Appendix I - The Art of Creating a Financially Rewarding RoyaltyBy Craig Haase
A. Introduction
Jan 1, 2003
-
Appendix I – Addition of Andrews Shafts – Input DataBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.
Jan 1, 1977
-
Appendix I – Computer Program ListingBy R. V. Ramani, C. B. Manula, A. Owili-Eger
• MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(
Jan 1, 1975
-
Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutionsBy R. V. Ramani, C. B. Manula, A. Owili-Eger
PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I
Jan 1, 1975
-
Appendix III - Analytical Pressure - Volume Computations For The Mine PrototypeBy R. V. Ramani, C. B. Manula, A. Owili-Eger
ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in
Jan 1, 1975
-
Appendix J ? Variability In Sampling And Analytical Methods - J.1 MSHA Gravimetric Method For Respirable Coal Mine DustThe current procedure for measuring the concentration of respirable coal mine dust is as follows. Each filter is preweighed by the filter manufacturer to ±0.1 mg. Following sampling with the Coal Mine
Jan 1, 1997
-
Appendix J – Additions of Andrews Shaft – Computer OutputBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix K – Addition of Ontario Shaft – Input DataBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 14 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 2
Jan 1, 1977