Search Documents

Sort by

  • TMS
    New Insoluble Lead Anodes for Copper Electrowinning

    By R. David Prengaman

    During the past several years a new insoluble lead anode has been developed for copper electrowinning. The new anode consists of a rolled lead-calcium-tin alloy sheet attached to a slotted copper bus

    Jan 1, 1987

  • SME
    New integer programming models for tactical and strategic underground production scheduling

    By A. Newman, M. Goycoolea

    "In this paper, we consider an underground production scheduling problem consisting of determining the proper time interval or intervals in which to complete each mining activity so as to maximize a m

    Mar 1, 2017

  • NIOSH
    New Interactive Training Tools Available To Coal And Aggregate Operators

    By Bill York-Feirn

    The Colorado Mine Safety & Training Program (MSTP), in late 2005, completed and began distributing two new training tools; one geared to underground coal mine foremen and the other to surface aggregat

    Jan 1, 2006

  • SME
    New Investigations of the Mineralogy of Silver in the World-Class Porphyry-Lode Deposits of Butte, Montana

    By J. Szarkowski

    "INTRODUCTION The Butte district of Montana is well-known as one of the biggest historic producers of copper in the world. It is also a classic example of a porphyry Cu-Mo system that has been overpri

    Jan 1, 2016

  • ABM
    New Iron Ore Sintering Technology Based On Biomass And Oxygen Injection

    By José Adilson de Castro

    In this paper a new technology for a compact iron ore sintering machine is analyzed. The compact sintering process is based on the massive injection of gaseous fuels and the solid fuel is only agglome

    Aug 2, 2018

  • SME
    New Japanese Technology For Economic Dredging Of Industrial/Mining Waste Ponds To Reprocess Materials

    By Peter Van deVelde

    Many companies in North America because of economic or environmental reasons are considering reprocessing material from their waste ponds. The Japanese have developed highly specialized machines and

    Jan 1, 1983

  • AIME
    New Jersey Zinc Co. - The Mines

    New Jersey Zinc Co. - The Mines Franklin-Sterling Friedensville Development Austinville Ivanhoe Development Eagle Mine Hanover

    Jan 12, 1953

  • AIME
    New Jersey Zinc Co. - The Plants

    New Jersey Zinc Co. - The Plants Canon City Palmerton Depue

    Jan 12, 1953

  • SME
    New Joint Venture Opportunities In Mexico

    By I. Martinez-Dominguez

    In September 1992, mining in Mexico was opened again to foreign investment by President Salinas-de Gortari, after thirty years of "Mexicanization" of mining industry which limited foreign participatio

    Jan 1, 1994

  • SME
    New KGV Design Opens the Door to Improved Efficiency for Slurry Valves

    By Michael Prince

    "Managing slurry is a constant challenge for mining operations. Since slurries are not uniform, the challenge is complicated by varying rheology, velocity, temperature and pressure, all of which affec

    Feb 1, 2019

  • CIM
    New Knowledge-Based System Prototype for Assisting Mine Operators in Predicting Stope Instability and Associated Unplanned Dilution

    By Somchet Vongpaisal

    This paper presents the R&D results on the development of a new knowledge-based system for predicting stope instability and associated unplanned dilution in deep underground mining operations. A new p

    Jun 1, 2012

  • SME
    New kriging method for estimation from strings of data in a finite domain - SME Transactions 2009

    By C. V. Deutsch, O. Babak

    A longstanding problem in geostatistics is that kriging usually assigns significantly greater weights to end samples in strings of data than it does to central samples. These weights are theoretically

    Jan 1, 2009

  • AIME
    New Laboratory Instrumentation For The Evaluation Of Rock Bolt Behavior

    By Z. T. Bieniawski, E. Unal, H. Reginald Hardy

    INTRODUCTION Rock bolts are a major means of support in underground coal mines in the United States. However, two of the most crucial problems facing the mining engineer today are that of finding a

    Jan 1, 1982

  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • ABM
    New Level 2 Automation Systems For Jsw Steel Toranagallu

    By Rudolf Hubmer

    In October 2013 JSW Steel decided to place an order to Primetals Technologies Austria (former Siemens VAI Metals Technologies) for the installation of a comprehensive Level 2 process optimization syst

    Aug 16, 2017

  • AIME
    New Light on Old Metallurgical Problems - Pertaining to Certain Structural Changes in Metals and Alloys

    By Wilfred P. Sykes

    AT intervals in the course of history an event occurs which, though scarcely heeded at the moment, marks in retrospect the beginning of a new era in some one field of human activity. Such a happening

    Jan 1, 1939

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • AIME
    New Liner Design Improves Aerofall Mill Throughput

    By H. R. Coles, S. P. Chong

    Test work conducted in the 6.4 and 10.5 m (21 and 34 ft) Aerofall mills at the Iron Ore Co. of Canada Carol project showed that conventionally used "deflector" type liners, which form the basic princi

    Jan 1, 1984

  • SME
    New Liner Design Improves Aerofall Mill Throughput*

    By H. R. Coles

    Test work conducted in the 6.4 and 10.52 m Aerofall Mills at the Iron Ore Company of Canada Carol Project showed that the conventionally used ?deflector?-type liners which form the basic principle of

    Jan 1, 1980

  • CIM
    New Locked Charge Protection System Prevents Damage To 14mw Geared Mill

    By H De Beer

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Nov 1, 2011