Search Documents

Sort by

  • CIM
    In-situ thermal analysis technology for aluminum foundry alloys

    To produce high quality castings, one must monitor the melt quality by evaluating such parameters as the grain refinement and silicon inoculation and modification during the production of the commerci

    Jan 1, 2004

  • SME
    In-Situ Underground Bioleaching – Novel Conditioning Technologies

    By R. Schlüter

    "The “Biohydrometallurgical Center for Strategic Elements (BHMZ)” is a cooperation of 13 departments of the Technical University Bergakademie Freiberg fostering interdisciplinary research along the wh

    Jan 1, 2015

  • SME
    In-Situ Uranium Mining with Oxygen

    By L. M. Litz

    In reply to Mr. DeVries comments on my paper, I would like to say that it is true, as pointed out by Mr. DeVries, that under some special conditions, the use of high concentrations of hydrogen peroxid

    Jan 1, 1982

  • SME
    In-Situ Uranium Mining With Oxygen (3a648064-aeaa-4139-b8a5-8808236de97c)

    By L. M. Litz

    The results of a study are presented in which gaseous oxygen was dissolved in the leach liquor at concentrations of the order of 300 parts per million. This oxygen-containing solution was injected int

    Jan 1, 1980

  • AIME
    In-Situ Uranium Mining With Oxygen (fb4ee5cb-ddf1-4044-a39c-0d689ac0eaf8)

    By L. M. Litz

    Study results are presented in which gaseous oxygen was dissolved in the leach liquor at concentrations of the order of 300 ppm. This oxygen-containing solution was injected into portions of a field b

    Jan 1, 1983

  • TMS
    In-Situ XRD Investigation of Bauxite Dehydroxylation

    By Hong Peng, James Vaughan

    Thermal activation of bauxite has been proposed to enable bauxite dissolution at a reduced digestion temperature and also to reduce the organic content in the liquor. Research has been carried out on

    Mar 1, 2018

  • SME
    In-Stope Back-Filling Control Using Millimeter Wave Radar at Olympic Dam Mine, South Australia

    By G. Brooker

    The back-filling operation at Olympic Dam mine supports a 9.8 million tonne per year (Mtla) underground Longhole Open Stoping operation. It involves a combination of Cemented Aggregate Fill (CAF), Sur

    Jan 1, 2001

  • SAIMM
    In-stope bolting for a safer working environment - Synopsis

    By P. Henning

    Rock fall accidents continue to be the main cause of fatal and serious injuries in the mining industry. Although there has been an improvement in the FOG (falls of ground) related fatal and serious in

    Jan 1, 2010

  • AUSIMM
    In-stope Material Handling

    In South African gold mines, the types of material requiring transportation to the stoping areas include timber packs, explosives, hydraulic rock props, scrapers, scraper winches, pipes, pumps and bac

    Jan 1, 2003

  • CIM
    In-the-hole drilling at Heath Steele Mines Limited

    By Errol Ladner

    The application of large-diameter bore holes in underground operations at Heath Steele was first tried in February, 1975. Since that time, 90,000 feet of 6-l/2-inch holes have been drilled, primarily

    Jan 1, 1979

  • AUSIMM
    In-The-Hole Drilling Equipment and Techniques

    I.T.H. Drilling has been accepted as a tool used daily for both production and service work in Australian underground mines. For this reason, it is of interest to examine the rigs and drilling equ

    Jan 1, 1978

  • SME
    In-the-wall haulage for open-pit mining

    By B. Seegmiller, W. A. Hustrulid, O. Stephansson

    Introduction The concept of in-the-wall haulage was formally introduced to the mining community in the early 1970s. The basic concept is simple. Rather than the traditional in-the-pit haulage/acces

    Jan 1, 1988

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • ISEE
    In-Transit Security, Technology & Best Practices

    By Mark Bauckman

    Discussion Topics • Market Needs • Technology Developments & Best Practices • Industry & Government Developments • Future Possibilities & Your Role

    Jan 1, 2006

  • AIME
    In-Transit Wind Erosion Losses of Coal and Method of Control (9ff75c1b-afcf-4988-9552-e2a8369b94b1)

    By K. H. Nimerick, G. P. Laflin

    Laboratory data and field tests indicate that substantial losses of valuable coal can be caused by wind erosion. Wind tunnel tests show the effects of wind velocity and particle sizing on the amount o

    Jan 1, 1980

  • SME
    Inability to communicate : How technical professionals cut short their management careers

    By H. Richard Eisenbeis, Donna M. Watkins

    Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort

    Jan 8, 1987

  • CIM
    INAC: Supporting Involvement of Aboriginal People in the Economy

    By Jr. Arcand

    Canadian Economy ? Getting Results ???? A stronger Canadian economy ???? National debt cut ???? Taxes reduced, tax-free savings account, support for manufacturing sector ???? Assisting with inf

    May 1, 2008

  • SME
    Inaccuracy Of Area Sampling For Measuring The Dust Exposure Of Mining Machine Operators In Coal Mines (cbfe9c3c-ee62-488f-9c4a-6c588b436e59)

    By F. N. Kissell, H. K. Sacks

    This study examines the accuracy of area sampling for measuring the dust exposure of mining machine operators in coal mines. The specific objective of this research was to find locations where an area

    Jan 1, 2003

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014