Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving Open Stope Productivity at Sunrise DamBy K Guilfoyle
AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo
Nov 8, 2011
-
Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.By Sebastián Seria, Jorge Álvarez, Diego Cáceres
The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the
Jan 26, 2026
-
Improving Ore Quality in Mine to Mill Using Through-Conveyor Real Time Elemental AnalysisApplications of proven real time, through-conveyor elemental analysis technology and benefits achieved will be discussed using case studies in base metals, iron ore and phosphate operations. PGNAA (Pr
Jan 1, 2016
-
Improving Ore Reserve Estimates for Precious Metals ProjectsBy J. Allen Hennessy
INTRODUCTION The increasing price of gold and silver over the past 10 years has caused increasing activity in the exploration, evaluation and development of precious metals projects. Many of these
Jan 1, 1987
-
Improving Our Understanding of 'Basement' to Help Reduce Related Hazards to Coal MiningBy C Woodfull, S Munroe
Geological uncertainty is reduced by improved understanding of the relationship between regional-scale geological basement features (structure, composition, depth) and known local structural risk (suc
Jan 1, 2006
-
Improving Overall Plant Performance With the Aid of Quantitative Models for Various Unit Operations Developed from In-Plant StudiesBy K. R. Weller, U. J. Sterns
The goal of most in-plant studies is to identify factors that limit overall plant performance. A major finding from such studies is that interactions between unit operations are always important, usua
Jan 1, 1989
-
Improving Pelletisation of Pyrite Cinder by High Pressure Roller GrindingImproving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa
Sep 13, 2010
-
Improving Pentlandite Pyrrhotite Separation at INCOÆs Clarabelle MillBy M Xu and, P F. Wells, A N. Kerr, Y Shields
Triethylene tetramine (TETA) has been used in combination with sodium sulfite (sulfite) for pyrrhotite depression at Clarabelle Mill since 1998. This combination has been highly successful at reducing
Jan 1, 2005
-
Improving Pentlandite Selectivity Over Pyrrhotite Using ReagentsImproving Pentlandite Selectivity Over Pyrrhotite Using Reagents
Sep 13, 2010
-
Improving performance at Rustenburg Base Metals Refiners copper tankhouse: Operational review and embracing fundamentalsBy K. Naidoo, M. Pelser, J. Hagemann, K. C. Sole
The copper tankhouse at Rustenburg Base Metals Refinery is an essential component of the Anglo American Platinum value chain. The tankhouse uses starter-sheet technology that was adopted in the 1980s,
Jun 27, 2025
-
Improving Performance Of Dust Controls For Continuous MinersLaboratory tests were conducted in a full-scale continuous miner test gallery to evaluate resulting dust levels for changes in face airflow, spray water quantity and pressure, and mining height. The m
Jan 1, 1994
-
Improving performance of heavy mineral processing plants through Six SigmaBy M. Akser, M. Tomas
Six Sigma is a methodology that uses a structured and disciplined approach to improve process performance (higher throughput, better recovery, lower cost, shorter cycle time, etc.). Specially trained
Jan 1, 2005
-
Improving performance of the Gol-E-Gohar iron ore concentration plant thickenerBy S. Banisi, E. Arghavani, Gh. Parsapour, S. Mousavi
Maximization of water recovery in thickeners is an essential step in the mineral processing industries. The Gol-E-Gohar iorn ore processing plant uses a center pier thickener with a diameter of 38 m a
Jan 1, 2014
-
Improving Performance of the Sarcheshmeh Copper Complex Cu-Mo ThickenerBy F. Molhem, S. Banisi, H. R. Montazari, E. Arghavani, Gh. R. Biniyaz, Gh. A. Parsapour
"Water plays a key role in mineral processing plants and to process one ton of ore 2.5 ton water is needed. Thickeners are commonly used for dewatering and recovering water in most processing plants.
Jan 1, 2018
-
Improving Performance Through "Gainsharing"By Walter E. Cook
BOB FALCONER: Without further ado I'm going to introduce our first speaker, Walt Cook. Walt is president of Strata Resources and is here with his business partner Joe Nenni. Joe would you stand u
Jan 1, 1998
-
Improving Phosphate Flotation With New Chemistry, Smart Flowsheet And Novel EquipmentBy P. Zhang
The Crago “Double Float” process is widely used in upgrading phosphate ore. This process is inefficient, as it floats about 30-40% of the sands in the flotation feed twice and requires a deoiling step
Jan 1, 2004
-
Improving Plant Operations Using Synergistic Solvent Extraction Technology and Organic MonitoringBy K B. Barnard, M D. Urbani
A synergistic solvent extraction (SX) system for nickel and cobalt recovery using Versatic 10 and decyl-4-pyridinecarboxylate was tested with BHP Billiton pilot plant leach solution. Another synergist
Jan 1, 2005
-
Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank CoalBy R. J. Snoby, J. K. Alderman
Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr
Jan 1, 2001
-
Improving processing by adaption to conditional geostatistical simulation of block compositions"Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s
Jan 1, 2015
-
Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold MineBy T A. Carter
In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he
Mar 24, 2014