Search Documents

Sort by

  • CIM
    Improvements in use of Satellite Images for Monitoring Changes in Hydro-Environmental Conditions

    By Michael J. Rosko

    Methods have been developed for processing and analyzing reflected solar radiation data obtained by Landsat 5 Thematic Mapper multispectral scanner. Spatial resolution for the Landsat series satellite

    Oct 1, 2009

  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    Improvements Needed in the Shipping of Sulphide Concentrates

    By Noel W. Kirshenbaum

    Difficulties and costs of transport markedly affect Canadian mineral producers because of distance from markets, weather conditions and rugged terrain. The chemical and physical nature of sulphide con

    Jan 1, 1969

  • TMS
    Improvements Of The Converter's Operation At Tamano Smelter

    By T. Maruyama

    Tamano Smelter of Hibi Kyodo Smelting Co., Ltd. has been operating with one Flash Furnace (FSFE) and three Peirce-Smith Converters since its start-up in 1972. Anode production capacity has increased f

    Jan 1, 1998

  • SME
    Improvements Of The Determination Of Block Grades From Blast Hole Data In Porphyry Type Deposits

    By Miche1 Dagbert

    In most open pit operations mining porphyry type deposits, production planning rests on an are reserve inventory block file which is derived from diamond drill hole data. With such a practice, the way

    Jan 1, 1978

  • TMS
    Improvements Of Zinc Roaster Waste Heat Boiler

    By Juha Järvi

    Outokumpu Zinc Oy has two separate roasting lines with fluidized bed furnaces and waste heat boilers for calcine collection and heat recovery. During the last 30 years, zinc production in Kokkola plan

    Jan 1, 2002

  • SME
    Improvements On Blasting Technique For Headrace Tunnels

    By Yoneji Kanoh, Masahiko Ohtsuka

    In Japanese tunneling history, it has commonly been accepted that the long-round driving is difficult due to the complicated geological condition. Therefore, the maximum past record has been less than

    Jan 1, 1983

  • TMS
    Improvements on Converter Operating Practice at Mufulira Smelter

    By John Sakala, Jeyapandian Sasikumar, Sydney Kwalela

    The Isasmelt Furnace was commissioned in September 2006 with a concentrates treatment capacity of 850,000 tonnes per annum. However, the converter section became a bottleneck to the high throughput. O

    Jan 1, 2012

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • TMS
    Improvements on the Process of Gold-Antimony Concentrate Smelting in China

    By Wei-feng Liu

    On the basis of the brief introduction of the gold-antimony concentrate smelting process in China, some problems in the original process were analyzed and the corresponding improvements were introduce

    Jan 1, 2008

  • SME
    Improvements Seen in Acid-Mine-Drainage Technology

    By William R. Yernberg

    The Fifth International Conference on acid rock drainage (ICARD 2000) was held May 21-24, 2000, in Denver, CO. The three-day conference consisted of about 150 oral presentations and poster sessions t

    Jan 1, 2000

  • TMS
    Improvements To BHP Hartley Platinum's Smelting Furnace

    BHP Hartley Platinum operates an electric smelting furnace to treat Cu-Ni-PGM concentrate at its plant in Selous, Zimbabwe. The furnace, originally built by others, has experienced problems including

    Jan 1, 1999

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • AIME
    Improvements To Coal Face Ventilation With Mining Machine Mounted Dust Scrubber Systems

    By A. D. S. Gillies

    The effectiveness of coal mine face ventilation and the ability of airflow to maintain satisfactory methane and respirable dust levels in the working face area has been studied through the use of scal

    Jan 1, 1986

  • CIM
    Improvements to Grassroots and Minesite Exploration using Titan 24: Overview and Applications of Titan 24 Deep Imaging Technology

    By Greg M. Hollyer

    The search for minerals in the future will be dominated by deeper exploration and the need to accurately target ?blind? deposits as more and more of the ?easy? near surface targets are exhausted. In t

    May 1, 2008

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • AUSIMM
    Improvements to Reinforcement Systems Through Dynamic Testing

    By A Thompson, E Villaescusa

    The Western Australian School of Mines (WASM), Kalgoorlie, has been performing dynamic testing of reinforcement systems as part of the Minerals and Energy Research Institute of Western Australia (MERI

    Jan 1, 2008

  • TMS
    Improvements to Stillwater Mining Company's Smelting! Furnace Yielding Increased Capacity and Productivity

    By N. Voennann

    Stillwater Mining Company operates an electric furnace at its smelter in Columbus, Montana to treat a Ni-Cu-platinum group metal concentrate along with secondary PGM bearing materials. Hatch Associate

    Jan 1, 1998

  • SME
    Improvements To Suspension Bars For Copper Starter Sheets And Lead Anodes

    By J. P. A. Hortley

    In conventional electrolytic copper production, looped copper starter sheets, on which the copper is deposited, are supported by hard-drawn copper bars. These bars have cross-sectional areas of betwee

    Jan 1, 1978

  • TMS
    Improvements To Taphole Design

    By Melissa L. Trapani

    The removal of molten products from metallurgical furnaces is one of the most hazardous and labour intensive processes in a non-ferrous smelter. The proximity of operators to the molten metal and slag

    Jan 1, 2002