Search Documents

Sort by

  • SME
    Improvements In Geotechnical Aspects Of Contract Documents For Underground Construction

    By Allen W. Hatheway, John A. Albritton, Lloyd B. Underwood

    Missouri River Division (FORD), U.S. Army Corps of Engineers (COE), has completed (October 1982) a study for the U.S. Air Force Ballistic Missile Office, in which desireable and needed changes in cont

    Jan 1, 1983

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • SME
    Improvements In Igarape Bahia Gold Mine

    By Luciano Ramos, Daniel Santos

    Igarape Bahia Mine, which is currently the largest gold producer in Brazil, belongs to Companhia Vale do Rio Doce - CVRD and is situated 250 miles south of Belem, state of Para, Brazil. It came into o

    Jan 1, 2000

  • CIM
    Improvements in Leaching of Gold and Silver from Sulphide Ore from Mexico with the CELP

    By Y. Thibault, G. Deschênes

    An open-pit mine, located in Mexico, processes an ore a rate of 4000 tpd, using conventional cyanidation and AYR. A laboratory study was conducted to increase silver extraction and to reduce the conce

    Jan 1, 2011

  • SME
    Improvements In Loading And Hauling Equipment And The Effect On Unit Costs

    By C. S. Davis

    In being asked to present this paper on the improvements in loading and hauling equipment and the effect on unit costs, Mr. Van De Water, your program chairman, stated that his reason for coming to a

    Jan 1, 1959

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • SME
    Improvements in Magnetite Processing Utilising Magnetic Separation Technologies - SME Annual Meeting 2025

    By George Mandarakas, Johan van Zyl, Karl-Heinz Becker

    The world’s climate today has changed compared to 10 or 20 years ago. Many countries face water shortages; water sourcing for mining activities has become harder to secure. ESG’s focus on the industry

    Feb 1, 2025

  • AIME
    Improvements In Mining Practice In The Butte District

    By E. R. Borcherdt

    METHODS and equipment are subject to study in the Butte district at all times in order that advantage may be taken of any new developments that might serve to increase efficiency and lower costs. Det

    Jan 1, 1941

  • AIME
    Improvements In Mining Practice In The Butte District (93328285-c4a6-45a8-ae16-91d7cd08a50d)

    By E. R. Borcherdt

    METHODS and equipment are subject to study in the Butte district at all times in order that advantage may be taken of any new developments that might serve to increase efficiency and lower costs. Det

    Jan 1, 1941

  • SME
    Improvements in Plant Scale Nitric-Sulfuric Acid Pressure Leaching of Refractory Sulfide concentrates

    By Corby G. Anderson

    Since 1985, the Sunshine Mining Company has used a patented nitric-sulfuric acid pressure leaching system for production of silver and copper from a refractory sulfide ore body. To better understand t

    Jan 1, 1991

  • AUSIMM
    Improvements in Process Control and Instrumentation at Batu Hijau

    By B Dunstan, F Wirfiyata

    PT Newmont Nusa Tenggara (PTNNT) operates the Batu Hijau copper and gold mine and process plant on the island of Sumbawa, Nusa Tenggara (Barat)  NTB, Indonesia. The plant consists of a nominal ca

    Jan 1, 2009

  • ISEE
    Improvements in Quarry Blasting Cost Effectiveness

    By P Cotton, N Cox

    The Brisbane City Council has implemented a program of continual improvement at its Mount Coottha Quarry in the heart of Brisbane, Australia. The program has been underway for the past 6 years, and ha

    Jan 1, 1996

  • ISEE
    Improvements in Quarry Blasting Cost Effectiveness (6a7d22cc-a510-497b-89ee-1733ae928c9c)

    By P Cotton, N Cox

    The Brisbane City Council has implemented a program of continual improvement at its Mount Coot-tha Quarry in the heart of Brisbane, Australia. The program has been underway for the past 6 years, and h

    Jan 1, 1995

  • SME
    Improvements In Resource Recovery At Stauffer's Big Island Mine

    By J. F. T. Agapito

    Significant increases in extraction ratio on the order of six to eight percent, equivalent to as much as 142 t/m of panel advance, have occurred at the Big Island Mine during the last five years with

    Jan 1, 1988

  • AIME
    Improvements in Rolling Iron and Steel

    By James E. York

    THE honor so fairly earned and so incompletely and tardily paid to Henry Cort, the inventor of the puddling-furnace and the, rolling-mill, has been fully set forth by Mr. Charles H. Morgan,1 and needs

    May 1, 1906

  • AIME
    Improvements in Roof Bolting Promise Greater Safety and Productivity

    By Will B. Jamison

    It is a fact that the most serious safety problems encountered in US underground coal mines are related to roof-bolting operations. It is also true that roof bolting is usually the operation which lim

    Jan 7, 1977

  • CIM
    Improvements in Sag Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation

    By Adrian Dance

    Newmont Ghana Gold Limited?s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting p

    Jan 1, 2012

  • CIM
    Improvements in SAG Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation (b60080de-d277-480f-a175-8d275f54e347)

    By Bryon Bisiaux, Walter Valery, Sonny Mwansa, George Amonoo, Adrian Dance

    "Newmont Ghana Gold Limited’s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting

    Jan 1, 2012

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015